Quick answers
What is this project?
Proposed forest land to be diverted for Construction of CC Road is a proposed road project in Baragaon, Hamirpur, Uttar Pradesh. The site covers 1.3 acres.
Who is building it?
The applicant is Block Development Officer, Sumerpur, Hamirpur.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Baragaon, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹36 lakh; a site of 1.3 acres and 2,280 m² of forest land.
When was it filed?
The application was filed on 12 Mar 2026.
Project details
| Official title | Proposed forest land to be diverted for Construction of CC Road, in District: Hamirpur (Uttar Pradesh). |
|---|---|
| Status | More information requested |
| Status since | 15 May 2026 |
| Application filed | 12 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Block Development Officer, Sumerpur, Hamirpur |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 2,280 m² |
| Project cost | ₹36 lakh |
| Village / locality | Baragaon |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06420 |
In context
15 applications in Hamirpur since January 2022 are in the same category (Roads & highways): 1 approved, 9 filed or under review, and 5 withdrawn, lapsed or rejected. At 1.3 acres, this one is smaller than 93% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baragaon, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Morrum Mine" Khand Sankhya-31/8, Gata No.- 01, 02, 03 over an area of 36.437… — environmental approval granted, 5 km away
- "Morrum Mine" Khand Sankhya-31/8, Gata No.- 01, 02, 03 over an area of 36.437… — cleared for impact study, 5 km away
- Proposed Project of riverbed "Morrum Mining Project for River Yamuna at Gata… — cleared for impact study, 5.6 km away
- SAND/MORRUM MINING ALONG YAMUNA RIVERBED at Khand No- 31/6, Gata No.- 01, 02,… — under environmental review, 6 km away
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Surauli Buzurg,… — under environmental review, 6.2 km away
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Surauli Buzurg,… — cleared for impact study, 6.2 km away
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Patyora, Khand No.-… — lapsed, 6.2 km away
- Morrum Mining from Yamuna Riverbed — cleared for impact study, 6.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.