Project details
| Official title | Protected Forest Land Proposed to be diverted for Entry/Exit approach to Indian Oil Corporation Limited Retail Outlet on Jalalabad - Katra Road, NH -730C in between Km. stone 109 to Km. 111 (RHS from Jalalabad towards Katra) at Khasra no. 223 Village- Naglaprathi/Nagariya, Tehsil- Tilhar, District - Shahjahanpur (Uttar Pradesh). |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 24 Sept 2026 |
| Application filed | 13 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 3,400 m² |
| Forest land | 2,160 m² |
| Project cost | ₹60 lakh |
| Village / locality | Nagla Prithi |
| Taluk / tehsil | Tilhar |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06421 |
In context
23 applications in Shahjahanpur since January 2022 are in the same category (Fuel stations): 10 approved, 9 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.8 acres, this one is smaller than 74% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nagla Prithi, Tilhar, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land Proposed to be diverted for Entry / Exit Approach to… — in-principle approval, conditions pending, 4 km away
- Proposed Forest Land to be diverted for Laying of Carbon Steel Pipeline — under forest review, 4.1 km away
- Proposed Forest Land to be diverted for Laying of Carbon Steel Pipeline — lapsed, 4.1 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to HPCL… — forest land use approved, 5.5 km away
- Bandhichak Soil Mining Project — environmental approval granted, 6.3 km away
- Protected Forest Land 0.7967 Hectare proposed for diversion for Entry/Exit… — forest land use approved, 7.1 km away
- Proposed Standalone Grinding Unit with Cement Production Capacity of 3.0… — environmental approval granted, 7.1 km away
- Proposed Standalone Grinding Unit with Cement Production Capacity of 3.0… — cleared for impact study, 7.1 km away
More from Indian Oil Corporation Limited (IOCL) in Shahjahanpur
- Protected Forest Land is Proposed to be diverted for Entry/Exit approach to… — under forest review
- Protected Forest Land Proposed to be diverted for Entry / Exit Approach to… — in-principle approval, conditions pending
8 Indian Oil Corporation (IOCL) projects in Shahjahanpur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.