Project details
| Official title | Proposed Forest Land to be diverted for Laying of Carbon Steel Pipeline in District- Shahjahanpur (Uttar Pradesh). |
|---|---|
| Status | Under forest review |
| Status since | 16 Nov 2026 |
| Application filed | 12 Mar 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Aether Green Fuel Two Private Limited |
| Land area | 500 m² |
| Forest land | 450 m² |
| Project cost | ₹3 crore |
| Village / locality | Katra |
| Taluk / tehsil | Tilhar |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06025 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 12 Mar 2026 (this page) | Under forest review | 0.1 acres | ₹3 crore |
| New project filed 13 Feb 2026 | Lapsed | 0.1 acres | ₹3 crore |
In context
7 applications in Shahjahanpur since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Katra, Tilhar, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be diverted for Laying of Carbon Steel Pipeline — lapsed, 0 m away
- Proposed Standalone Grinding Unit with Cement Production Capacity of 3.0… — environmental approval granted, 2.9 km away
- Proposed Standalone Grinding Unit with Cement Production Capacity of 3.0… — cleared for impact study, 2.9 km away
- Protected Forest Land 0.7967 Hectare proposed for diversion for Entry/Exit… — forest land use approved, 2.9 km away
- Grain based distillery plant of capacity - 500 KLD — environmental approval granted, 3.1 km away
- Grain based distillery plant of capacity - 500 KLD — cleared for impact study, 3.1 km away
- Protected Forest Land Proposed to be diverted for Entry/Exit approach to… — in-principle approval, conditions pending, 4.1 km away
- Tilhar-Khudaganj OFC laying under Block Connectivity — lapsed, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.