Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Ken River of M/s Delving Mining Pvt. Ltd., Director- Shri Rishi Kant Tiwari, located at Gata No. 165, 166 & 174, Village- Padoharakhadar, Tehsil- Pailani, District- Banda, Uttar-Pradesh. Sanctioned Lease Area- 34.59 acre (14.00 ha) is a proposed mining project in Padohara, Banda, Uttar Pradesh. The site covers 34.6 acres.
Who is building it?
The applicant is Delving Mining Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Oct 2024), as of 27 Nov 2026.
Where is it?
In Padohara, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2.5 crore and a site of 34.6 acres.
When was it filed?
The application was filed on 16 May 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed sand/morrum mining project from Ken River of M/s Delving Mining Pvt.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Oct 2024 |
| Application filed | 16 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Delving Mining Private Limited |
| Land area | 34.6 acres (14 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Padohara |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01736 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Jan 2025 | Environmental approval granted | 34.6 acres | ₹2.5 crore |
| Early planning filed 16 May 2024 (this page) | Cleared for impact study | 34.6 acres | ₹2.5 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 34.6 acres, this one is larger than 50% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Padohara, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed riverbed sand/morrum mining project from Ken River of M/s Delving… — environmental approval granted, 0 m away
- "Sand/ Morrum Mining" Project at Gata No.- 58, 107, 108, 109, 110, 111, & 114,… — environmental approval granted, 1.8 km away
- "Sand/ Morrum Mining" Project at Gata No.- 58, 107, 108, 109, 110, 111, & 114,… — cleared for impact study, 1.8 km away
- Proposed Forest Land to be Diverted for Widening and Strengthening of Road — more information requested, 2.1 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — environmental approval granted, 3.8 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — cleared for impact study, 3.8 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s J P O… — environmental approval granted, 4.5 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s J P O… — cleared for impact study, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.