What is Developing? Open the mapMap

Cleared for impact studyMining · Banda, Uttar Pradesh

Proposed riverbed sand/morrum mining project from Ken River of M/s Delving Mining Pvt. Ltd., Director- Shri Rishi Kant Tiwari, located at Gata No. 165, 166 & 174, Village- Padoharakhadar, Tehsil- Pailani, District- Banda, Uttar-Pradesh. Sanctioned Lease Area- 34.59 acre (14.00 ha).

Proposed riverbed sand/morrum mining project from Ken River of M/s Delving Mining Pvt. Ltd., Director- Shri Rishi Kant Tiwari, located at Gata No. 165, 166 & 174, Village- Padoharakhadar, Tehsil- Pailani, District- Banda, Uttar-Pradesh. Sanctioned Lease Area- 34.59 acre (14.00 ha) is a proposed mining project in Padohara, Banda, Uttar Pradesh. The site covers 34.6 acres. Its stated project cost is ₹2.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 21 Oct 2024).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed riverbed sand/morrum mining project from Ken River of M/s Delving Mining Pvt. Ltd., Director- Shri Rishi Kant Tiwari, located at Gata No. 165, 166 & 174, Village- Padoharakhadar, Tehsil- Pailani, District- Banda, Uttar-Pradesh. Sanctioned Lease Area- 34.59 acre (14.00 ha) is a proposed mining project in Padohara, Banda, Uttar Pradesh. The site covers 34.6 acres.

Who is building it?

The applicant is Delving Mining Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 21 Oct 2024), as of 27 Nov 2026.

Where is it?

In Padohara, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹2.5 crore and a site of 34.6 acres.

When was it filed?

The application was filed on 16 May 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed sand/morrum mining project from Ken River of M/s Delving Mining Pvt.…

Project details

StatusCleared for impact study
Status since21 Oct 2024
Application filed16 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantDelving Mining Private Limited
Land area34.6 acres (14 ha)
Project cost₹2.5 crore
Village / localityPadohara
Taluk / tehsilBanda
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01736

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 1 Jan 2025Environmental approval granted34.6 acres₹2.5 crore
Early planning filed 16 May 2024 (this page)Cleared for impact study34.6 acres₹2.5 crore

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 34.6 acres, this one is larger than 50% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Padohara, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.