Quick answers
What is this project?
Proposed Forest Land to be Diverted for Widening and Strengthening of Road is a proposed road project in Paparenda, Banda, Uttar Pradesh. The site covers 80.5 acres.
Who is building it?
The applicant is Virendra Kumar Srivastava.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Paparenda, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹78.3 crore; a site of 80.5 acres and 1.9 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 9 Apr 2026.
Project details
| Official title | Proposed Forest Land to be Diverted for Widening and Strengthening of Road, in District: Banda (Uttar Pradesh). |
|---|---|
| Status | More information requested |
| Status since | 30 Oct 2026 |
| Application filed | 9 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Virendra Kumar Srivastava |
| Land area | 80.5 acres (32.6 ha) |
| Forest land | 1.9 acres (0.8 ha) |
| Project cost | ₹78.3 crore |
| Village / locality | Paparenda |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05476 |
In context
9 applications in Banda since January 2022 are in the same category (Roads & highways): 3 approved, 5 filed or under review, and 1 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Paparenda, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/ Morrum Mining" Project at Gata No.- 58, 107, 108, 109, 110, 111, & 114,… — environmental approval granted, 1.9 km away
- "Sand/ Morrum Mining" Project at Gata No.- 58, 107, 108, 109, 110, 111, & 114,… — cleared for impact study, 1.9 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Delving… — environmental approval granted, 2.1 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Delving… — cleared for impact study, 2.1 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — environmental approval granted, 2.3 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — cleared for impact study, 2.3 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s J P O… — environmental approval granted, 4.5 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s J P O… — cleared for impact study, 4.5 km away
More from Virendra Kumar Srivastava in Banda
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.