Quick answers
What is this project?
DIVERSION OF 4.465 ha. PROTECTED FOREST LAND FOR STRENTHENING AND WIDENING OF DELHI-KANPUR ROAD (OLD NH-91) CITY AREA FROM KM CH. 125.00 TO KM CH. 129.700 (BHANKARI KHAS TO SOOTMILL) IN 4.70 KMS is an approved road project in Sarsaul, Koil, Aligarh, Uttar Pradesh. The site covers 24.3 acres.
Who is building it?
The applicant is Public Works Department.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 19 Apr 2026), as of 27 Nov 2026.
Where is it?
In Sarsaul, Koil, Aligarh, Uttar Pradesh.
How big is it?
It has a stated cost of ₹67.8 crore; a site of 24.3 acres and 11 acres (4.5 ha) of forest land.
When was it filed?
The application was filed on 9 Aug 2024.
Project details
| Official title | DIVERSION OF 4.465 ha. PROTECTED FOREST LAND FOR STRENTHENING AND WIDENING OF DELHI-KANPUR ROAD (OLD NH-91) CITY AREA FROM KM CH. 125.00 TO KM CH. 129.700 (BHANKARI KHAS TO SOOTMILL) IN 4.70 KMS IN DISTRICT-ALIGARH BY PROVISIONAL DIVISION, PUBLIC WORKS DEPARTMENT, ALIGARH |
|---|---|
| Status | Forest land use approved |
| Status since | 19 Apr 2026 |
| Application filed | 9 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Public Works Department |
| Land area | 24.3 acres (9.9 ha) |
| Forest land | 11 acres (4.5 ha) |
| Project cost | ₹67.8 crore |
| Village / locality | Sarsaul |
| Taluk / tehsil | Koil |
| District | Aligarh |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06634 |
In context
10 applications in Aligarh since January 2022 are in the same category (Roads & highways): 5 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 24.3 acres, this one is larger than 50% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarsaul, Koil, Aligarh, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas… — more information requested, 1.1 km away
- Proposed Commercial Building & Bus Stand of Uttar Pradesh Parivahan Nigam at… — more information requested, 2.6 km away
- UP Defence Industrial Corridor – Aligarh Node (Phase- II) — cleared for impact study, 3 km away
- Diversion of protected forest land for construction of approach road to the… — in-principle approval, conditions pending, 6.1 km away
- Diversion of protected forest land for Construction of approach road to the… — forest land use approved, 6.3 km away
- Diversion of 0.0428 Hectare of protected Forest land under Social forestry… — forest land use approved, 7.2 km away
- Fuel station by Indian Oil Corporation Limited — forest land use approved, 7.3 km away
- Proposed Group Housing namely "Jaimahal", Kasba Koil -2, Near Sarai Harnarayan… — initial checks, 7.5 km away
More from Public Works Department in Aligarh
- Diversion of protected forest land for Four-lane widening and strengthening… — forest land use approved
- Diversion of protected forest land for Four-lane widening and strengthening… — forest land use approved
- Diversion of 0.2204 Hec. Protected Forest Land Proposed to Be Diverted for… — more information requested
4 Public Works Department, Uttar Pradesh projects in Aligarh
All 43 Public Works Department, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.