Quick answers
What is this project?
Proposed forest land to be diverted for Construction of Water Storage Overhead Tank under Khatan Group of Villages Drinking Water Scheme of Jal Jeevan Mission of Govt. of India is an approved pipeline project in Kiratpur, Naraini, Banda, Uttar Pradesh. The site covers 0.3 acres.
Who is building it?
The applicant is Project Manager, Temporary Construction Unit, U.P. Jal Nigam (Rural), Chitrakoot (U.P.).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Sept 2025), as of 27 Nov 2026.
Where is it?
In Kiratpur, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 lakh; a site of 0.3 acres and 920 m² of forest land.
When was it filed?
The application was filed on 18 Sept 2023.
Project details
| Official title | Proposed forest land to be diverted for Construction of Water Storage Overhead Tank under Khatan Group of Villages Drinking Water Scheme of Jal Jeevan Mission of Govt. of India, in District:- Banda . |
|---|---|
| Status | Forest land use approved |
| Status since | 17 Sept 2025 |
| Application filed | 18 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Project Manager, Temporary Construction Unit, U.P. Jal Nigam (Rural), Chitrakoot (U.P.) |
| Land area | 1,100 m² |
| Forest land | 920 m² |
| Project cost | ₹1 lakh |
| Village / locality | Kiratpur |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06654 |
In context
5 applications in Banda since January 2022 are in the same category (Pipelines): 3 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Kiratpur, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be diverted for Construction of Entrance Gate — forest land use approved, 5.6 km away
- Environmental clearance for sand/morrum mining from riverbed of Baghain, at… — environmental approval granted, 11.9 km away
- Sand/Moram Mining Project — returned to applicant, 11.9 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Gata… — environmental approval granted, 12.6 km away
- "Sand/Morrum Mining" from Riverbed of Baghein River — environmental approval granted, 12.6 km away
- Building stone (Gitti/Patthar & Pahari Morrum) mine at Gata No.-315 (Khand… — under environmental review, 12.7 km away
- Building stone (Gitti/Patthar & Pahari Morrum) mine at Gata No.-315 (Khand… — under environmental review, 12.7 km away
- Proposed Mining of Gitti/Stone & Pahadi Morrum for Shri Rajesh Kumar Tripathi… — environmental approval granted, 12.7 km away
More from Project Manager, Temporary Construction Unit, U.P. Jal Nigam (Rural), Chitrakoot (U.P.) in Banda
- Proposed forest land to be diverted for Laying of Drinking Water Pipeline… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.