Quick answers
What is Sand/Moram Mining Project?
Sand/Moram Mining Project is a proposed mining project in Sidhauti, Naraini, Banda, Uttar Pradesh. The site covers 8.8 acres.
Who is building it?
The applicant is Jag Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Sidhauti, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹98 lakh and a site of 8.8 acres.
When was it filed?
The application was filed on 10 Jan 2024.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 18 Jun 2024 |
| Application filed | 10 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jag Singh |
| Land area | 8.8 acres (3.6 ha) |
| Project cost | ₹98 lakh |
| Village / locality | Sidhauti |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01940 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 8.8 acres, this one is smaller than 83% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Sidhauti, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental clearance for sand/morrum mining from riverbed of Baghain, at… — environmental approval granted, 0 m away
- "Sand/Morrum Mining" from Riverbed of Baghein River — environmental approval granted, 1.2 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Gata… — environmental approval granted, 1.2 km away
- Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor… — initial checks, 2.7 km away
- Proposed riverbed sand/morrum mining project from Ranj River of M/s Victor… — under environmental review, 2.7 km away
- Proposed "Sand/ Morrum Mining" Project at Gata No.- 585/1, 857, 859/1, 914,… — environmental approval granted, 3.1 km away
- Proposed "Sand/ Morrum Mining" Project at Gata No.- 585/1, 857, 859/1, 914,… — cleared for impact study, 3.1 km away
- Sand/Morrum Mining Project at Gata 420, 530/2, 532, 709, and 716, 6.93… — more information requested, 3.9 km away
More from Jag Singh in Banda
- Environmental clearance for sand/morrum mining from riverbed of Baghain, at… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.