What is Developing? Open the mapMap

Forest land use approvedFuel stations · Amroha, Uttar Pradesh

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet is an approved fuel station in Sheonali, Amroha, Uttar Pradesh. The site covers 1.1 acres. Its stated project cost is ₹65 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 17 Mar 2026).

See it on the live map All projects in Amroha

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet is an approved fuel station in Sheonali, Amroha, Uttar Pradesh. The site covers 1.1 acres.

Who is building it?

The applicant is Hindustan Petroleum Corporation Limited (HPCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 17 Mar 2026), as of 27 Nov 2026.

Where is it?

In Sheonali, Amroha, Uttar Pradesh.

How big is it?

It has a stated cost of ₹65 lakh; a site of 1.1 acres and 1,940 m² of forest land.

When was it filed?

The application was filed on 12 Jun 2025.

Project details

Official titleProposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet at Village:-Shyonali, Tehsil & District:-Amroha (Uttar Pradesh).
StatusForest land use approved
Status since17 Mar 2026
Application filed12 Jun 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantHindustan Petroleum Corporation Limited (HPCL)
Land area1.1 acres (0.4 ha)
Forest land1,940 m²
Project cost₹65 lakh
Village / localitySheonali
Taluk / tehsilAmroha
DistrictAmroha
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-07251

In context

30 applications in Amroha since January 2022 are in the same category (Fuel stations): 20 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 1.1 acres, this one is larger than 80% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sheonali, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hindustan Petroleum Corporation Limited (HPCL) in Amroha

8 Hindustan Petroleum Corporation (HPCL) projects in Amroha
All 508 Hindustan Petroleum Corporation (HPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.