Forest land use approvedPower · Rampur, Uttar Pradesh

Proposed protected Forest Land to be diverted for construction of LOOP OUT Circuit of LILO of 765KV S/C Ghatampur-Hapur (WUPPTCL) Line at 765 KV GIS Substation Rampur

Proposed protected Forest Land to be diverted for construction of LOOP OUT Circuit of LILO of 765KV S/C Ghatampur-Hapur (WUPPTCL) Line at 765 KV GIS Substation Rampur is an approved power project in Birjpur, Milak, Rampur, Uttar Pradesh. The site covers 5,484.7 acres. Its stated project cost is ₹467 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 16 Oct 2024).

See it on the live map All projects in Rampur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed protected Forest Land to be diverted for construction of LOOP OUT Circuit of LILO of 765KV S/C Ghatampur-Hapur (WUPPTCL) Line at 765 KV GIS Substation Rampur is an approved power project in Birjpur, Milak, Rampur, Uttar Pradesh. The site covers 5,484.7 acres.

Who is building it?

The applicant is Powergrid Gomti Yamuna Transmission Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 16 Oct 2024), as of 27 Nov 2026.

Where is it?

In Birjpur, Milak, Rampur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹467 crore; a site of 5,484.7 acres and 6.3 acres (2.5 ha) of forest land.

When was it filed?

The application was filed on 16 Mar 2023.

Project details

Official titleProposed protected Forest Land to be diverted for construction of LOOP OUT Circuit of LILO of 765KV S/C Ghatampur-Hapur (WUPPTCL) Line at 765 KV GIS Substation Rampur, in District:-Rampur, Badaun & Aligarh (UP).
StatusForest land use approved
Status since16 Oct 2024
Application filed16 Mar 2023
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantPowergrid Gomti Yamuna Transmission Limited
Land area5,484.7 acres (2,219.6 ha)
Forest land6.3 acres (2.5 ha)
Project cost₹467 crore
Village / localityBirjpur
Taluk / tehsilMilak
DistrictRampur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06725

In context

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Birjpur, Milak, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Powergrid Gomti Yamuna Transmission Limited in Rampur

All 3 Powergrid Gomti Yamuna projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.