Project details
| Official title | Diversion of Forest Land for "Widening & up-gradation of Anupshahar–Shikarpur Road (ODR) from Km 14.00 to Km 25.85 in District Bulandshahr, Uttar Pradesh". |
|---|---|
| Status | Under forest review |
| Status since | 12 Oct 2026 |
| Application filed | 1 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Construction Divison Pwd Khurja |
| Land area | 30.1 acres (12.2 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹32 lakh |
| Village / locality | Darveshpur |
| Taluk / tehsil | Shikarpur |
| District | Bulandshahr |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06756 |
In context
17 applications in Bulandshahr since January 2022 are in the same category (Roads & highways): 2 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. At 30.1 acres, this one is larger than 71% of them.
Where it is
Darveshpur, Shikarpur, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Reserved Forest Land to Be Diverted for Construction of… — initial checks, 5.9 km away
- Re-diversion of forest land for Jio Digital Fibre Private Limited Project for… — lapsed, 11.3 km away
- Expansion of Distillery From 200 Kld (B-Heavy Molasses) to 450 Kld Through… — environmental approval granted, 13.4 km away
- Expansion of existing Sugar unit from 7000 TCD to 10,000 TCD and expansion in… — environmental approval granted, 13.4 km away
- Expansion of existing Sugar unit from 7000 TCD to 10,000 TCD and expansion in… — cleared for impact study, 13.4 km away
- "no Increase in Pollution Load Certificate" for Proposed Expansion of Existing… — initial checks, 13.5 km away
- "no Increase in Pollution Load Certificate" for Proposed Expansion of Existing… — initial checks, 13.5 km away
- Project for Forest Clearence:- लोक निर्माण विभाग ,प्रांतीय डिवीजन ,बुलंदशहर… — lapsed, 15.5 km away
More from Executive Engineer Construction Divison Pwd Khurja in Bulandshahr
- Proposed Reserved Forest Land to Be Diverted for Construction of… — initial checks
- Proposed Forest Land to be diverted for two lane to four lane Widening and… — more information requested
All 3 Executive Engineer Construction, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.