Quick answers
What is 4g Saturation Project?
4g Saturation Project is a lapsed telecom project in Baragaon, Chunar, Mirzapur, Uttar Pradesh. It seeks 2.3 acres of forest land.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 14 Aug 2023, so it is no longer under consideration.
Where is it?
In Baragaon, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹18 lakh and 2.3 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 20 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Aug 2023 |
| Application filed | 20 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹18 lakh |
| Village / locality | Baragaon |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06826 |
In context
7 applications in Mirzapur since January 2022 are in the same category (Telecom): 0 approved, 1 filed or under review, and 6 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baragaon, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building stone (Sandstone)" Mine at Araji/Gata No.-597Kha, Lease area- 1.8… — environmental approval granted, 3 km away
- "Building stone (Sandstone)" Mine at Araji/Gata No.-597Kha, Lease area- 1.8… — environmental approval granted, 3.1 km away
- Proposed "Building Stone (Sand Stone)" Project at Gata No.- 59Kh, Village-… — environmental approval granted, 3.1 km away
- Area: 1.25 Ha. "Building Stone (Sandstone)" Project at Araji No.- 517 — environmental approval granted, 3.3 km away
- Proposed forest land to be diverted for Doubling of Chunar-Chopan Railway Line… — under forest review, 3.8 km away
- "Building Stone (Sandstone)" mine — environmental approval granted, 5.2 km away
- Rampur Saktegarh Building stone Sand Stone Mining project — environmental approval granted, 5.8 km away
- Rampur Saktegarh Building stone Sand Stone Mining project — cleared for impact study, 5.8 km away
More from Mahesh Nair in Mirzapur
- Laying of Underground Optical Fibre Cable — lapsed
- Laying of Underground Optical Fibre Cable — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.