Quick answers
What is Laying of Underground Optical Fibre Cable?
Laying of Underground Optical Fibre Cable is a lapsed telecom project in Ballipur, Chunar, Mirzapur, Uttar Pradesh. It seeks 0.7 acres of forest land.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Ballipur, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹27 lakh and 3,000 m² of forest land.
When was it filed?
The application was filed on 18 Jan 2023.
Project details
| Official title | Laying of Underground Optical Fibre Cable Along with Chunar Road (Durgaji Modh) to Kashi Nath Khad Bhandar Bhedi Road, Total 6.0 km & 0.300 Ha , District:- Mirzapur (Uttar Pradesh) |
|---|---|
| Status | Lapsed |
| Status since | 18 Jul 2023 |
| Application filed | 18 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Forest land | 3,000 m² |
| Project cost | ₹27 lakh |
| Village / locality | Ballipur |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06305 |
In context
7 applications in Mirzapur since January 2022 are in the same category (Telecom): 0 approved, 1 filed or under review, and 6 withdrawn, lapsed or rejected.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ballipur, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Cement Production Clinker Grinding Unit Capacity From… — initial checks, 2.4 km away
- Terms of Reference Application for Expansion of Existing Unit From 96mt/Day to… — environmental approval granted, 2.5 km away
- Terms of Reference Application for Expansion of Existing Unit From 96mt/Day to… — cleared for impact study, 2.5 km away
- Proposed Expansion of Existing Unit From 96 TPD To 700 TPD MS Billets Through… — more information requested, 2.7 km away
- Proposed Integrated Steel Plant: Sponge Iron (2,31,000 TPA), Steel Melting… — lapsed, 2.9 km away
- Transfer of Environmental Clearance for "Cement Grinding Unit" at Araji… — environmental approval granted, 3.2 km away
- Proposed Sardar Patel Apex University, situated at NH-35, Mirzapur–Varanasi… — under environmental review, 4.3 km away
- Building Stone (Sandstone) Mine — environmental approval granted, 4.4 km away
More from Mahesh Nair in Mirzapur
- 4g Saturation Project — lapsed
- Laying of Underground Optical Fibre Cable — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.