Quick answers
What is Laying of Underground Optical Fibre Cable?
Laying of Underground Optical Fibre Cable is a lapsed telecom project in Bheri, Chunar, Mirzapur, Uttar Pradesh. It seeks 1.1 acres of forest land.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Bheri, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and 1.1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 18 Jan 2023.
Project details
| Official title | Laying of Underground Optical Fibre Cable Along with Kashi Nath Khad Bhandar Bhedi, Chunar Road to Sakteshgarh Road, Total 8.5 km & 0.4250 Ha , District:- Mirzapur (Uttar Pradesh) |
|---|---|
| Status | Lapsed |
| Status since | 18 Jul 2023 |
| Application filed | 18 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Bheri |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06030 |
In context
7 applications in Mirzapur since January 2022 are in the same category (Telecom): 0 approved, 1 filed or under review, and 6 withdrawn, lapsed or rejected.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bheri, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone Sand Stone" Project at Gata No.- 531 Ga, 531 Gha, Village-… — cleared for impact study, 2.2 km away
- "Building Stone Sand Stone" Project at Gata No.- 531 Ga, 531 Gha, Village-… — environmental approval granted, 2.2 km away
- Rampur Saktegarh Building stone Sand Stone Mining project — environmental approval granted, 2.3 km away
- Rampur Saktegarh Building stone Sand Stone Mining project — cleared for impact study, 2.3 km away
- "Building stone (Sandstone)" Mine at Araji/Gata No.-384/1/6, Lease area- 0.809… — environmental approval granted, 3 km away
- Building stone (Sandstone)" mine at Gata No.- 303mi, Area 1.25 Ha., Village–… — environmental approval granted, 3.7 km away
- Proposed Project of Building stone Sand Stone Mine of Smt Vibha Devi at Gata… — under environmental review, 3.7 km away
- Proposed Project of Building stone Sand Stone Mine of Smt Vibha Devi at Gata… — cleared for impact study, 3.7 km away
More from Mahesh Nair in Mirzapur
- 4g Saturation Project — lapsed
- Laying of Underground Optical Fibre Cable — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.