Quick answers
What is this project?
Proposed Protected Forest Land To Be Diverted In Favour Of Executive Engineer Provincial Division (PWD) Hapur For Widening And Strengthening (2-lane With Paved Shoulder) Of Bulandshahr Garh Road (MDR 117 W) From KM 38 CH. 37.000 To 49.500 (NH-9, Delhi-Bareilly-Lucknow Road) Total Length 12.500KM is a lapsed road project in Alipur, Garhmukteshwar, Hapur, Uttar Pradesh. The site covers 11.2 acres.
Who is building it?
The applicant is Public Works Department.
Has it been approved?
No. The application was lapsed on 3 Oct 2026, so it is no longer under consideration.
Where is it?
In Alipur, Garhmukteshwar, Hapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹53 lakh; a site of 11.2 acres and 10.8 acres (4.4 ha) of forest land.
When was it filed?
The application was filed on 22 Aug 2026.
Project details
| Official title | Proposed Protected Forest Land To Be Diverted In Favour Of Executive Engineer Provincial Division (PWD) Hapur For Widening And Strengthening (2-lane With Paved Shoulder) Of Bulandshahr Garh Road (MDR 117 W) From KM 38 CH. 37.000 To 49.500 (NH-9, Delhi-Bareilly-Lucknow Road) Total Length 12.500KM under the CRIF scheme In District Hapur (U.P.) |
|---|---|
| Status | Lapsed |
| Status since | 3 Oct 2026 |
| Application filed | 22 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Public Works Department |
| Land area | 11.2 acres (4.5 ha) |
| Forest land | 10.8 acres (4.4 ha) |
| Project cost | ₹53 lakh |
| Village / locality | Alipur |
| Taluk / tehsil | Garhmukteshwar |
| District | Hapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07004 |
In context
7 applications in Hapur since January 2022 are in the same category (Roads & highways): 3 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alipur, Garhmukteshwar, Hapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal… — lapsed, 2.4 km away
- Diversion of 0.150 Ha. of Protected Forest Land for proposed IGL Laying of 125… — in-principle approval, conditions pending, 3.1 km away
- Allabuxpur Soil Mining Project — under environmental review, 4.2 km away
- "Ordinary Earth Mine" — lapsed, 4.4 km away
- "Ordinary Earth Mine", Village- Bagadpur, Gata No.- 692, 693 & 695कमि, Area-… — environmental approval granted, 4.4 km away
- Allabuxpur Soil Mining Project — under environmental review, 4.4 km away
- Allabuxpur Soil Mining Project — under environmental review, 4.4 km away
- "Ordinary Earth Mine", Village- Bagadpur, Gata No.- 695kh & 699, Lease Area-… — environmental approval granted, 4.6 km away
More from Public Works Department in Hapur
- NOC Wildlife Clearance of Proposed Non-Forest Land In State Animal Barasingha… — more information requested
All 43 Public Works Department, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.