Quick answers
What is this project?
Diversion of 0.150 Ha. of Protected Forest Land for proposed IGL Laying of 125 mm MDPE Gas Pipeline along Garh-Siyana Marg, Garh Bangar, Nangli, Salarpur from Chainage Km 44+000 to Km 49+000 (Total Length 5 Km) under Hapur Forest Division is a proposed pipeline project in Garh Bangar, Garhmukteshwar, Hapur, Uttar Pradesh. The site covers 0.4 acres.
Who is building it?
The applicant is Indraprastha Gas Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Garh Bangar, Garhmukteshwar, Hapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.4 acres and 1,500 m² of forest land.
When was it filed?
The application was filed on 30 Sept 2023.
Project details
| Official title | Diversion of 0.150 Ha. of Protected Forest Land for proposed IGL Laying of 125 mm MDPE Gas Pipeline along Garh-Siyana Marg, Garh Bangar, Nangli, Salarpur from Chainage Km 44+000 to Km 49+000 (Total Length 5 Km) under Hapur Forest Division in Garhmukteshwar Tehsil & District Hapur in Uttar Pradesh State |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 31 Dec 2025 |
| Application filed | 30 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Indraprastha Gas Limited |
| Land area | 1,500 m² |
| Forest land | 1,500 m² |
| Project cost | ₹60 lakh |
| Village / locality | Garh Bangar |
| Taluk / tehsil | Garhmukteshwar |
| District | Hapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06765 |
In context
6 applications in Hapur since January 2022 are in the same category (Pipelines): 1 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Garh Bangar, Garhmukteshwar, Hapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal… — lapsed, 650 m away
- Allabuxpur Soil Mining Project — under environmental review, 1.3 km away
- Allabuxpur Soil Mining Project — under environmental review, 1.5 km away
- Allabuxpur Soil Mining Project — under environmental review, 1.5 km away
- "Ordinary Earth Mine" — lapsed, 1.7 km away
- "Ordinary Earth Mine", Village- Bagadpur, Gata No.- 692, 693 & 695कमि, Area-… — environmental approval granted, 1.7 km away
- "Ordinary Earth Mine", Village- Bagadpur, Gata No.- 695kh & 699, Lease Area-… — environmental approval granted, 1.8 km away
- Diversion of 0.099 ha of Protected Forest Land under approach road for… — forest land use approved, 1.9 km away
More from Indraprastha Gas Limited in Hapur
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To… — more information requested
- Laying of 8" NB Carbon Steel Gas Pipeline in favour of M/S Indarprastha Gas… — under wildlife review
- Diversion of 0.150 Ha PF LAND in favour of M/S Indarprastha Gas Ltd. New Delhi… — lapsed
- Indraprastha Gas Limited,New Delhi project for Laying of 8" NB Carbon Steel… — forest land use approved
- Diversion of 0.10 ha of Protected Forest Land for proposed permission for… — forest land use approved
- Diversion of 0.855 Ha. of Protected Forest Land for proposed IGL Laying of 8"… — more information requested
9 Indraprastha Gas projects in Hapur
All 84 Indraprastha Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.