What is Developing? Open the mapMap

Forest land use approvedFuel stations · Basti, Uttar Pradesh

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet Village:- Pikaura Tappa Padiya, Tehsil:- Basti, District:- Basti.

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet Village:- Pikaura Tappa Padiya, Tehsil:- Basti, District:- Basti is an approved fuel station in Pandit Pur, Basti, Uttar Pradesh. The site covers 0.5 acres. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 3 Mar 2025).

See it on the live map All projects in Basti

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet Village:- Pikaura Tappa Padiya, Tehsil:- Basti, District:- Basti is an approved fuel station in Pandit Pur, Basti, Uttar Pradesh. The site covers 0.5 acres.

Who is building it?

The applicant is Bharat Petroleum Corporation Limited (BPCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 3 Mar 2025), as of 27 Nov 2026.

Where is it?

In Pandit Pur, Basti, Uttar Pradesh.

How big is it?

It has a stated cost of ₹60 lakh; a site of 0.5 acres and 130 m² of forest land.

When was it filed?

The application was filed on 13 Jan 2025.

Project details

StatusForest land use approved
Status since3 Mar 2025
Application filed13 Jan 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantBharat Petroleum Corporation Limited (BPCL)
Land area2,100 m²
Forest land130 m²
Project cost₹60 lakh
Village / localityPandit Pur
Taluk / tehsilBasti
DistrictBasti
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05490

In context

15 applications in Basti since January 2022 are in the same category (Fuel stations): 8 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.5 acres, this one is smaller than 100% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pandit Pur, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bharat Petroleum Corporation Limited (BPCL) in Basti

6 Bharat Petroleum Corporation (BPCL) projects in Basti
All 656 Bharat Petroleum Corporation (BPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.