What is Developing? Open the mapMap

Under forest reviewFuel stations · Basti, Uttar Pradesh

Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet

Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet is a proposed fuel station in Hordiya Khurd, Basti, Uttar Pradesh. The site covers 0.9 acres. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Under forest review” (since 8 Sept 2026).

See it on the live map All projects in Basti

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet is a proposed fuel station in Hordiya Khurd, Basti, Uttar Pradesh. The site covers 0.9 acres.

Who is building it?

The applicant is Bharat Petroleum Corporation Limited (BPCL).

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Hordiya Khurd, Basti, Uttar Pradesh.

How big is it?

It has a stated cost of ₹60 lakh; a site of 0.9 acres and 1,730 m² of forest land.

When was it filed?

The application was filed on 31 Aug 2026.

Project details

Official titleProposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Hardiya Khurd, Tehsil:- Basti, District:- Basti (Uttar Pradesh).
StatusUnder forest review
Status since8 Sept 2026
Application filed31 Aug 2026
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantBharat Petroleum Corporation Limited (BPCL)
Land area3,700 m²
Forest land1,730 m²
Project cost₹60 lakh
Village / localityHordiya Khurd
Taluk / tehsilBasti
DistrictBasti
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06219

In context

15 applications in Basti since January 2022 are in the same category (Fuel stations): 8 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.9 acres, this one is smaller than 60% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hordiya Khurd, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bharat Petroleum Corporation Limited (BPCL) in Basti

6 Bharat Petroleum Corporation (BPCL) projects in Basti
All 656 Bharat Petroleum Corporation (BPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.