Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet is a proposed fuel station in Hordiya Khurd, Basti, Uttar Pradesh. The site covers 0.9 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Hordiya Khurd, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.9 acres and 1,730 m² of forest land.
When was it filed?
The application was filed on 31 Aug 2026.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Hardiya Khurd, Tehsil:- Basti, District:- Basti (Uttar Pradesh). |
|---|---|
| Status | Under forest review |
| Status since | 8 Sept 2026 |
| Application filed | 31 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,700 m² |
| Forest land | 1,730 m² |
| Project cost | ₹60 lakh |
| Village / locality | Hordiya Khurd |
| Taluk / tehsil | Basti |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06219 |
In context
15 applications in Basti since January 2022 are in the same category (Fuel stations): 8 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.9 acres, this one is smaller than 60% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hordiya Khurd, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 2.1 km away
- Basti Ring Road (Phase-I) with 4-lane confurigation design (Design length… — forest land use approved, 4.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to Reliance BP… — forest land use approved, 7.8 km away
- Proposed Forest Land to be Diverted for Approach Access to HPCL Retail Outlet… — in-principle approval, conditions pending, 11 km away
- Proposed Protected Forest Land to be diverted for construction of new… — lapsed, 11.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed, 13.7 km away
- Proposed Forest Land to be Diverted for Approach Access to M/s Anita… — lapsed, 16.6 km away
- Proposed Grain Based Distillery Capacity – 200 Kld by M/S Anita Distillery… — environmental approval granted, 16.6 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Basti
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
6 Bharat Petroleum Corporation (BPCL) projects in Basti
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.