Proposed "Ordinary Soil Mining" Project at Gata No.- 219/3, 222/2, 235, 236, 391, 394, 397, 398, Village-Bhadavan Banger, Tehsil-MAT, District- Mathura, Uttar Pradesh. (Area-1.4858 Ha).

Proposed "Ordinary Soil Mining" Project at Gata No.- 219/3, 222/2, 235, 236, 391, 394, 397, 398, Village-Bhadavan Banger, Tehsil-MAT, District- Mathura, Uttar Pradesh. (Area-1.4858 Ha) is a proposed mining project in Bhadravan Bangar, Mat, Mathura, Uttar Pradesh. The site covers 3.7 acres. Its stated project cost is ₹13 lakh. As of 27 Nov 2026, its status is “Initial checks” (since 23 Nov 2026).

See it on the live map All projects in Mathura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Ordinary Soil Mining" Project at Gata No.- 219/3, 222/2, 235, 236, 391, 394, 397, 398, Village-Bhadavan Banger, Tehsil-MAT, District- Mathura, Uttar Pradesh. (Area-1.4858 Ha) is a proposed mining project in Bhadravan Bangar, Mat, Mathura, Uttar Pradesh. The site covers 3.7 acres.

Who is building it?

The applicant is Jugendra Singh.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Bhadravan Bangar, Mat, Mathura, Uttar Pradesh.

How big is it?

It has a stated cost of ₹13 lakh and a site of 3.7 acres.

When was it filed?

The application was filed on 23 Nov 2026.

Project details

StatusInitial checks
Status since23 Nov 2026
Application filed23 Nov 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantJugendra Singh
Land area3.7 acres (1.5 ha)
Project cost₹13 lakh
Village / localityBhadravan Bangar
Taluk / tehsilMat
DistrictMathura
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-07586

In context

28 applications in Mathura since January 2022 are in the same category (Mining): 10 approved, 18 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.7 acres, this one is smaller than 86% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Bhadravan Bangar, Mat, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.