Quick answers
What is this project?
Samauli Khadar Sand Mining Project, Located on river bed of Yamuna River (7.7320ha) is an approved mining project in Samauli Khadar, Mat, Mathura, Uttar Pradesh. The site covers 19.1 acres.
Who is building it?
The applicant is Ram Naresh Nishad.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Jun 2026), as of 27 Nov 2026.
Where is it?
In Samauli Khadar, Mat, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2 crore and a site of 19.1 acres.
When was it filed?
The application was filed on 28 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Jun 2026 |
| Application filed | 28 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ram Naresh Nishad |
| Land area | 19.1 acres (7.7 ha) |
| Project cost | ₹2 crore |
| Village / locality | Samauli Khadar |
| Taluk / tehsil | Mat |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04963 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Feb 2026 (this page) | Environmental approval granted | 19.1 acres | ₹2 crore |
| Early planning filed 3 May 2025 | Cleared for impact study | 19.1 acres | ₹2 crore |
In context
28 applications in Mathura since January 2022 are in the same category (Mining): 10 approved, 18 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 19.1 acres, this one is larger than 79% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Samauli Khadar, Mat, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Samauli Khadar Sand Mining Project, Located on river bed of Yamuna River… — cleared for impact study, 0 m away
- Proposed "Ordinary Soil Mining" Project at Gata No.- 219/3, 222/2, 235, 236,… — initial checks, 3.6 km away
- Bhidauni Khadar Sand Mining Project, Located on river bed of Yamuna River… — environmental approval granted, 5.2 km away
- Bhidauni Khadar Sand Mining Project, Located on river bed of Yamuna River… — cleared for impact study, 5.2 km away
- Proposed "Ordinary Soil Mining" Project at Gata No.- 257, 255, 264, 261, 258,… — initial checks, 7.7 km away
- Diversion of protected forest land for Construction of approach road to the… — forest land use approved, 11.5 km away
- "Ordinary Soil Mining" Project at Gata No.- 2477मि0, Village- Arruwa Banger,… — under environmental review, 13.5 km away
- Proposed Project "The Service Apartment Building" at Khasra No. 958 & 959,… — under environmental review, 14.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.