What is this project?
"Ordinary Soil Mining" Project at Gata No.- 2477मि0, Village- Arruwa Banger, Tehsil- Mat, District- Mathura, Uttar Pradesh. (Area-2.6700 Ha). Smt. Meenu Chaudhary is a proposed mining project in Arrua Bangarh, Mat, Mathura, Uttar Pradesh. The site covers 6.6 acres.
Who is building it?
The applicant is Meenu Chaudhary.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Arrua Bangarh, Mat, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹18 lakh and a site of 6.6 acres.
When was it filed?
The application was filed on 25 Sept 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 25 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Meenu Chaudhary |
| Land area | 6.6 acres (2.7 ha) |
| Project cost | ₹18 lakh |
| Village / locality | Arrua Bangarh |
| Taluk / tehsil | Mat |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04020 |
In context
28 applications in Mathura since January 2022 are in the same category (Mining): 10 approved, 18 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.6 acres, this one is larger than 61% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Arrua Bangarh, Mat, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Mining" Project at Gata No.- 53, 69, Village- Guddarsaur,… — environmental approval granted, 2.8 km away
- "Ordinary Soil Mining" Project at Gata No.- 88, 91, Village-Guddasaur,… — under environmental review, 2.9 km away
- "Ordinary Soil Mining" Project at Gata No.- 127, Village- Birhana, Tehsil-… — under environmental review, 7 km away
- "Ordinary Soil Mining" Project at Gata No.- 925, Village-Gaiyara, Tehsil-Mat,… — under environmental review, 7.1 km away
- Forest Land Proposed for diversion from Vrindavan Gate near Pagal Baba Mandir… — forest land use approved, 7.4 km away
- Diversion of protected forest land for Construction of 604.525 m long Two-lane… — in-principle approval, conditions pending, 8.1 km away
- Diversion of protected forest land for Construction of 604.525 m long Two-lane… — lapsed, 8.1 km away
- Proposed Group Housing Situated at Khasra No. - 68/ 8 M & 67, Mauza Sunrakh… — more information requested, 9.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.