| Official title | Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000 Tpa Along With Installation Of Aod Of 25 Ton For Stainless Steel Products With Existing Facility Of Sms (1,35,000 Tpa), Sponge Iron (1,20,000 Tpa) & 15 Mw Cpp (Whrb#8 Mw+afbc#7 Mw) By M/s Satyam Iron & Steel Co. Pvt. Ltd |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Nov 2022 |
| Application filed | 3 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Satyam Iron and Steel Co. PVT. LTD. |
| Land area | 20.5 acres (8.3 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Mangalpur |
| Taluk / tehsil | Raniganj |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00004 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 6 Dec 2023 | Environmental approval granted | 20.5 acres | ₹1.8 crore |
| Expansion filed 3 Nov 2022 (this page) | Environmental approval granted | 20.5 acres | ₹1.8 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 20.5 acres, this one is smaller than 66% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mangalpur, Raniganj, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion Under 7(Ii)(A) in the Existing Steel Plant by Increasing the… — returned to applicant, 0 m away
- Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000… — environmental approval granted, 0 m away
- Expansion Cum Amendment Under 7(Ii)(A) in the Existing Steel Plant by… — under environmental review, 0 m away
- Expansion of Steel Plant with increase in Sponge Iron prod. from 120000TPA to… — returned to applicant, 100 m away
- Proposed Expansion cum modification of Existing Steel Plant — returned to applicant, 150 m away
- Proposed Expansion cum modification of Existing Steel Plant — lapsed, 150 m away
- Proposed Expansion cum Modification of Existing Steel Plant. — environmental approval granted, 450 m away
- Proposed Expansion cum Modification of Existing Steel Plant. — cleared for impact study, 450 m away
More from Satyam Iron and Steel Co. PVT. LTD. in Paschim Bardhaman
- Expansion Cum Amendment Under 7(Ii)(A) in the Existing Steel Plant by… — under environmental review
- Expansion of Steel Plant with increase in Sponge Iron prod. from 120000TPA to… — returned to applicant
All 8 Satyam Iron and Steel Co projects across India