What is Developing? Open the mapMap

Environmental approval grantedIndustry · Paschim Bardhaman, West Bengal

Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000 Tpa by M/s Satyam Iron & Steel Co. Pvt. Ltd

Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000 Tpa by M/s Satyam Iron & Steel Co. Pvt. Ltd is an approved industrial project in Mangalpur, Raniganj, Paschim Bardhaman, West Bengal. The site covers 20.5 acres. Its stated project cost is ₹1.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 3 Nov 2022).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000 Tpa by…

Project details

Official titleExpansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000 Tpa Along With Installation Of Aod Of 25 Ton For Stainless Steel Products With Existing Facility Of Sms (1,35,000 Tpa), Sponge Iron (1,20,000 Tpa) & 15 Mw Cpp (Whrb#8 Mw+afbc#7 Mw) By M/s Satyam Iron & Steel Co. Pvt. Ltd
StatusEnvironmental approval granted
Status since3 Nov 2022
Application filed3 Nov 2022
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantSatyam Iron and Steel Co. PVT. LTD.
Land area20.5 acres (8.3 ha)
Project cost₹1.8 crore
Village / localityMangalpur
Taluk / tehsilRaniganj
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00004

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 6 Dec 2023Environmental approval granted20.5 acres₹1.8 crore
Expansion filed 3 Nov 2022 (this page)Environmental approval granted20.5 acres₹1.8 crore

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 20.5 acres, this one is smaller than 66% of them.

21 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mangalpur, Raniganj, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Satyam Iron and Steel Co. PVT. LTD. in Paschim Bardhaman

All 8 Satyam Iron and Steel Co projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.