One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion cum modification of Existing Steel Plant
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 21 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shyam Sel & Power Limited |
| Land area | 39.6 acres (16 ha) |
| Project cost | ₹225.6 crore |
| Village / locality | Mangalpur |
| Taluk / tehsil | Raniganj |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00259 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 Jul 2023 | Returned to applicant | 39.6 acres | ₹225.6 crore |
| Early planning filed 21 Jul 2023 (this page) | Lapsed | 39.6 acres | ₹225.6 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 39.6 acres, this one is larger than 59% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mangalpur, Raniganj, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion cum modification of Existing Steel Plant — returned to applicant, 0 m away
- Expansion Cum Amendment Under 7(Ii)(A) in the Existing Steel Plant by… — under environmental review, 150 m away
- Expansion Under 7(Ii)(A) in the Existing Steel Plant by Increasing the… — returned to applicant, 150 m away
- Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000… — environmental approval granted, 150 m away
- Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000… — environmental approval granted, 150 m away
- Expansion of Steel Plant with increase in Sponge Iron prod. from 120000TPA to… — returned to applicant, 200 m away
- Proposed Expansion cum Modification of Existing Steel Plant. — environmental approval granted, 450 m away
- Proposed Expansion cum Modification of Existing Steel Plant. — cleared for impact study, 450 m away
More from Shyam Sel & Power Limited in Paschim Bardhaman
- Transfer of Environmental Clearance for 5,88,800 Tpa Cold Rolling Mill Complex… — under environmental review
- Proposed Integrated Steel Plant — environmental approval granted
- "No Increase in Pollution Load" Certificate for Increasing of Production… — initial checks
- Industrial project by Shyam SEL and Power Limited — more information requested
- Industrial project by Shyam Sel and Power Limited — more information requested
9 Shyam Sel & Power projects in Paschim Bardhaman
All 16 Shyam Sel & Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.