One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion cum Modification of Existing Steel Plant.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 2 Oct 2024 |
| Application filed | 1 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Gaurav Jajodia |
| Land area | 86 acres (34.8 ha) |
| Project cost | ₹1,375 crore |
| Village / locality | Baktarnagar |
| Taluk / tehsil | Raniganj |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00572 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 3 Aug 2026 | Environmental approval granted | 86 acres | ₹1,375 crore |
| Early planning filed 1 Oct 2024 (this page) | Cleared for impact study | 86 acres | ₹1,375 crore |
| Early planning filed 2 Aug 2024 | Returned to applicant | 86 acres | ₹1,375 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 86 acres, this one is larger than 72% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baktarnagar, Raniganj, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion cum Modification of Existing Steel Plant. — environmental approval granted, 0 m away
- Proposed Expansion cum Modification of Existing Steel Plant. — returned to applicant, 0 m away
- Expansion of Steel Plant with increase in Sponge Iron prod. from 120000TPA to… — returned to applicant, 350 m away
- Expansion in Sponge Iron Production from 49,500 TPA to 1, 22,100 TPA by M/s… — environmental approval granted, 350 m away
- Expansion Cum Amendment Under 7(Ii)(A) in the Existing Steel Plant by… — under environmental review, 450 m away
- Expansion Under 7(Ii)(A) in the Existing Steel Plant by Increasing the… — returned to applicant, 450 m away
- Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000… — environmental approval granted, 450 m away
- Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000… — environmental approval granted, 450 m away
More from Gaurav Jajodia in Paschim Bardhaman
- Proposed Capacity Enhancement (40% Maximum in Two Stages of Maximum 20% Each)… — environmental approval granted
- Proposed Capacity Enhancement (40% Maximum in Two Stages of Maximum 20% Each)… — withdrawn
- Proposed Expansion of Existing Steel Plant by enhancement of Production… — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.