What is Developing? Open the mapMap

Environmental approval grantedIndustry · Puruliya, West Bengal

Expansion of Shakambhari Ispat & Power Limited plant for production of 0.7875 million tons per annum Crude Steel/Stainless Steel, 0.214272 million tons per annum Ferro-Alloys (maximum)

Expansion of Shakambhari Ispat & Power Limited plant for production of 0.7875 million tons per annum Crude Steel/Stainless Steel, 0.214272 million tons per annum Ferro-Alloys (maximum) is an approved industrial project in Madandi, Neturia, Puruliya, West Bengal. The site covers 200.4 acres. Its stated project cost is ₹13.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 23 Mar 2023).

See it on the live map All projects in Puruliya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Shakambhari Ispat & Power Limited plant for production of 0.7875 million tons per annum Crude Steel/Stainless Steel, 0.214272 million tons per annum Ferro-Alloys (maximum) is an approved industrial project in Madandi, Neturia, Puruliya, West Bengal. The site covers 200.4 acres.

Who is building it?

The applicant is Shakambhari Ispat and Power LTD.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 23 Mar 2023), as of 27 Nov 2026.

Where is it?

In Madandi, Neturia, Puruliya, West Bengal.

How big is it?

It has a stated cost of ₹13.2 crore and a site of 200.4 acres.

When was it filed?

The application was filed on 23 Mar 2023.

Project details

Official titleExpansion of Shakambhari Ispat & Power Limited plant for production of 0.7875 million tons per annum Crude Steel/Stainless Steel, 0.214272 million tons per annum Ferro-Alloys (maximum) along with allied facilities at Village: Parvatpur, Madandih, Radhamadabpur, P.O.: Bortoria, Tehsil: Raghunathpur, District: Purulia, West Bengal
StatusEnvironmental approval granted
Status since23 Mar 2023
Application filed23 Mar 2023
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantShakambhari Ispat and Power LTD
Land area200.4 acres (81.1 ha)
Project cost₹13.2 crore
Village / localityMadandi
Taluk / tehsilNeturia
DistrictPuruliya
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00014

In context

33 applications in Puruliya since January 2022 are in the same category (Industry): 22 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 200.4 acres, this one is larger than 52% of them.

19 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Madandi, Neturia, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shakambhari Ispat and Power LTD in Puruliya

All 9 Shakambhari Ispat & Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.