Sponge Iron Plant (4x100 TPD Kilns), Induction Furnaces (3x20 T), 1,40,000 TPA capacity Rolling Mill is an approved industrial project in Kendapara, Neturia, Puruliya, West Bengal. The site covers 35 acres.
Who is building it?
The applicant is Mrs Balmukund Metallics Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Jul 2026), as of 27 Nov 2026.
Where is it?
In Kendapara, Neturia, Puruliya, West Bengal.
How big is it?
It has a stated cost of ₹150 crore and a site of 35 acres.
When was it filed?
The application was filed on 21 May 2026.
Project details
| Official title | Proposed Installation of Sponge Iron Plant (4x100 TPD Kilns), Induction Furnaces (3x20 T), 1,40,000 TPA capacity Rolling Mill along with 16 MW capacity Captive Power Plant (8 MW WHRB based & 8 MW AFBC based, utilization waste heat & dolochar from the proposed sponge plant) and 1,00,000 TPA Cement Grinding Unit |
|---|---|
| Status | Environmental approval granted |
| Status since | 21 Jul 2026 |
| Application filed | 21 May 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Mrs Balmukund Metallics Private Limited |
| Land area | 35 acres (14.2 ha) |
| Project cost | ₹150 crore |
| Village / locality | Kendapara |
| Taluk / tehsil | Neturia |
| District | Puruliya |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01816 |
In context
33 applications in Puruliya since January 2022 are in the same category (Industry): 22 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 35 acres, this one is smaller than 67% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kendapara, Neturia, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application of "No Increase in Pollution Load" Certificate for Change in… — initial checks, 950 m away
- Transfer of Environment Clearance due to change in Change in CIN & GSTIN… — environmental approval granted, 950 m away
- Transfer of Environment Clearance due to change in Change in CIN & GSTIN… — withdrawn, 950 m away
- Expansion of Shakambhari Ispat & Power Limited plant for production of 0.7875… — environmental approval granted, 950 m away
- Expansion of M/s Rabindra Enterprises Pvt Ltd for enhancement of sponge iron… — cleared for impact study, 2.8 km away
- Expansion of M/s Rabindra Enterprises Pvt Ltd for enhancement of sponge iron… — lapsed, 2.8 km away
- Expansion of M/s Rabindra Enterprises Pvt. Ltd. for enhancement of sponge iron… — cleared for impact study, 2.8 km away
- Expansion of M/s Rabindra Enterprises Pvt. Ltd. for enhancement of sponge iron… — cleared for impact study, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.