Environmental approval grantedIndustry · Puruliya, West Bengal

Sponge Iron Plant (4x100 TPD Kilns), Induction Furnaces (3x20 T), 1,40,000 TPA capacity Rolling Mill

Sponge Iron Plant (4x100 TPD Kilns), Induction Furnaces (3x20 T), 1,40,000 TPA capacity Rolling Mill is an approved industrial project in Kendapara, Neturia, Puruliya, West Bengal. The site covers 35 acres. Its stated project cost is ₹150 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 21 Jul 2026).

See it on the live map All projects in Puruliya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sponge Iron Plant (4x100 TPD Kilns), Induction Furnaces (3x20 T), 1,40,000 TPA capacity Rolling Mill is an approved industrial project in Kendapara, Neturia, Puruliya, West Bengal. The site covers 35 acres.

Who is building it?

The applicant is Mrs Balmukund Metallics Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 21 Jul 2026), as of 27 Nov 2026.

Where is it?

In Kendapara, Neturia, Puruliya, West Bengal.

How big is it?

It has a stated cost of ₹150 crore and a site of 35 acres.

When was it filed?

The application was filed on 21 May 2026.

Project details

Official titleProposed Installation of Sponge Iron Plant (4x100 TPD Kilns), Induction Furnaces (3x20 T), 1,40,000 TPA capacity Rolling Mill along with 16 MW capacity Captive Power Plant (8 MW WHRB based & 8 MW AFBC based, utilization waste heat & dolochar from the proposed sponge plant) and 1,00,000 TPA Cement Grinding Unit
StatusEnvironmental approval granted
Status since21 Jul 2026
Application filed21 May 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorIndustry
ApplicantMrs Balmukund Metallics Private Limited
Land area35 acres (14.2 ha)
Project cost₹150 crore
Village / localityKendapara
Taluk / tehsilNeturia
DistrictPuruliya
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01816

In context

33 applications in Puruliya since January 2022 are in the same category (Industry): 22 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 35 acres, this one is smaller than 67% of them.

17 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kendapara, Neturia, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.