Quick answers
What is Proposed expansion of existing steel plant?
Proposed expansion of existing steel plant is an approved industrial project in Neturia, Puruliya, West Bengal. The site covers 103 acres.
Who is building it?
The applicant is Ispat Damodar Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Nov 2022), as of 27 Nov 2026.
Where is it?
In Neturia, Puruliya, West Bengal.
How big is it?
It has a stated cost of ₹283 crore and a site of 103 acres.
When was it filed?
The application was filed on 29 Nov 2022.
Project details
| Official title | Proposed expansion of existing steel plant at Village: Nambagram, P.O. - Digha, P.S. - Neturia, Dist. - Purulia, West Bengal |
|---|---|
| Status | Environmental approval granted |
| Status since | 29 Nov 2022 |
| Application filed | 29 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Ispat Damodar Private Limited |
| Land area | 103 acres (41.7 ha) |
| Project cost | ₹283 crore |
| Taluk / tehsil | Neturia |
| District | Puruliya |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00015 |
In context
33 applications in Puruliya since January 2022 are in the same category (Industry): 22 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 103 acres, this one is smaller than 55% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Neturia, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Steel Plant. — environmental approval granted, 750 m away
- Proposed Expansion of Existing Steel Plant. — cleared for impact study, 750 m away
- Cluster no. 5 total production capacity of 0.42 in a ML area of 2291.0 Ha of… — lapsed, 1.6 km away
- Manufacturing unit of TMT bars (Capacity 1,35,000TPA) by setting up Induction… — environmental approval granted, 2 km away
- Manufacturing unit of TMT bars (Capacity 1,35,000TPA) by setting up Induction… — cleared for impact study, 2 km away
- Expansion of M/s Rabindra Enterprises Pvt Ltd for enhancement of sponge iron… — cleared for impact study, 2.5 km away
- Expansion of M/s Rabindra Enterprises Pvt Ltd for enhancement of sponge iron… — lapsed, 2.5 km away
- Expansion of M/s Rabindra Enterprises Pvt. Ltd. for enhancement of sponge iron… — cleared for impact study, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.