Quick answers
What is this project?
Cluster no. 5 total production capacity of 0.42 in a ML area of 2291.0 Ha of M/s Eastern Coalfields Limited is a lapsed mining project in Saltor (Ct), Neturia, Puruliya, West Bengal. The site covers 5,661.2 acres.
Who is building it?
The applicant is Eastern Coalfields LTD.
Has it been approved?
No. The application was lapsed on 24 Oct 2026, so it is no longer under consideration.
Where is it?
In Saltor (Ct), Neturia, Puruliya, West Bengal.
How big is it?
It has a stated cost of ₹76.8 crore and a site of 5,661.2 acres.
When was it filed?
The application was filed on 7 Sept 2026.
Project details
| Official title | Cluster no. 5 total production capacity of 0.42 in a ML area of 2291.0 Ha of M/s Eastern Coalfields Limited located in Raniganj Coalfields District Purulia, West Bengal. |
|---|---|
| Status | Lapsed |
| Status since | 24 Oct 2026 |
| Application filed | 7 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Eastern Coalfields LTD |
| Land area | 5,661.2 acres (2,291 ha) |
| Project cost | ₹76.8 crore |
| Village / locality | Saltor (Ct) |
| Taluk / tehsil | Neturia |
| District | Puruliya |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01821 |
In context
49 applications in Puruliya since January 2022 are in the same category (Mining): 26 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 5,661.2 acres, this one is larger than 98% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Saltor (Ct), Neturia, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Steel Plant. — environmental approval granted, 800 m away
- Proposed Expansion of Existing Steel Plant. — cleared for impact study, 800 m away
- Proposed expansion of existing steel plant — environmental approval granted, 1.6 km away
- Manufacturing unit of TMT bars (Capacity 1,35,000TPA) by setting up Induction… — environmental approval granted, 3.6 km away
- Manufacturing unit of TMT bars (Capacity 1,35,000TPA) by setting up Induction… — cleared for impact study, 3.6 km away
- Expansion of M/s Rabindra Enterprises Pvt Ltd for enhancement of sponge iron… — cleared for impact study, 3.7 km away
- Expansion of M/s Rabindra Enterprises Pvt Ltd for enhancement of sponge iron… — lapsed, 3.7 km away
- Expansion of M/s Rabindra Enterprises Pvt. Ltd. for enhancement of sponge iron… — cleared for impact study, 3.7 km away
All 28 Eastern Coalfields projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.