Environmental approval grantedIndustry · Puruliya, West Bengal

Manufacturing unit of TMT bars (Capacity 1,35,000TPA) by setting up Induction Furnace, (Capacity-3Nos of 15MT of each) Rolling mill, (Capacity -1,35,000TPA) and CCM(1,35,000TPA) Plant.

Manufacturing unit of TMT bars (Capacity 1,35,000TPA) by setting up Induction Furnace, (Capacity-3Nos of 15MT of each) Rolling mill, (Capacity -1,35,000TPA) and CCM(1,35,000TPA) Plant is an approved industrial project in Lalpur, Neturia, Puruliya, West Bengal. The site covers 30.3 acres. Its stated project cost is ₹36 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 2 Jul 2024).

See it on the live map All projects in Puruliya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Manufacturing unit of TMT bars (Capacity 1,35,000TPA) by setting up Induction Furnace, (Capacity-3Nos of 15MT of each) Rolling mill, (Capacity -1,35,000TPA) and CCM(1,35,000TPA) Plant is an approved industrial project in Lalpur, Neturia, Puruliya, West Bengal. The site covers 30.3 acres.

Who is building it?

The applicant is Purulia Ispat Alloys Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 2 Jul 2024), as of 27 Nov 2026.

Where is it?

In Lalpur, Neturia, Puruliya, West Bengal.

How big is it?

It has a stated cost of ₹36 crore and a site of 30.3 acres.

When was it filed?

The application was filed on 10 Apr 2024.

Project details

StatusEnvironmental approval granted
Status since2 Jul 2024
Application filed10 Apr 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantPurulia Ispat Alloys Private Limited
Land area30.3 acres (12.3 ha)
Project cost₹36 crore
Village / localityLalpur
Taluk / tehsilNeturia
DistrictPuruliya
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00874

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 10 Apr 2024 (this page)Environmental approval granted30.3 acres₹36 crore
Early planning filed 18 May 2023Cleared for impact study30.3 acres₹36 crore

In context

33 applications in Puruliya since January 2022 are in the same category (Industry): 22 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 30.3 acres, this one is smaller than 79% of them.

19 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Lalpur, Neturia, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.