Environmental approval grantedIndustry · Puruliya, West Bengal

Expansion of Sponge Iron Plant(1,20,000 to 15,84,000 TPA),Captive Power Plant(10 MW to 145 MW–WHRB, AFBC & CFBC Boiler),Ferro Alloy(1x9 MVA to 8x9 MVA)

Expansion of Sponge Iron Plant(1,20,000 to 15,84,000 TPA),Captive Power Plant(10 MW to 145 MW–WHRB, AFBC & CFBC Boiler),Ferro Alloy(1x9 MVA to 8x9 MVA) is an approved industrial project in Babuijor, Santuri, Puruliya, West Bengal. The site covers 320.6 acres. Its stated project cost is ₹3,565 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Feb 2024).

See it on the live map All projects in Puruliya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Sponge Iron Plant(1,20,000 to 15,84,000 TPA),Captive Power Plant(10 MW to 145 MW–WHRB, AFBC & CFBC Boiler),Ferro Alloy(1x9 MVA to 8x9 MVA) is an approved industrial project in Babuijor, Santuri, Puruliya, West Bengal. The site covers 320.6 acres.

Who is building it?

The applicant is Sps Steels Rolling Mills Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 26 Feb 2024), as of 27 Nov 2026.

Where is it?

In Babuijor, Santuri, Puruliya, West Bengal.

How big is it?

It has a stated cost of ₹3,565 crore and a site of 320.6 acres.

When was it filed?

The application was filed on 22 Nov 2023.

Project details

Official titleExpansion of Sponge Iron Plant(1,20,000 to 15,84,000 TPA),Captive Power Plant(10 MW to 145 MW–WHRB, AFBC & CFBC Boiler),Ferro Alloy(1x9 MVA to 8x9 MVA), along with New Installation of Steel Melting Shop(10,05,000 TPA),Rolling Mill(9,97,500 TPA),Pellet Plant(2x2.4 MTPA),Sinter Plant(1,00,000 TPA),Jigging plant(1,65,000 TPA),Briquetting plant(3,00,000 TPA),Oxygen Plant(170 TPD)&Railway Siding at Village Poradiha,Chandurdi&Shunurhi,PO–Pachhandapur,PS–Santuri,Tehsil Raghunathpur,District Purulia,WB
StatusEnvironmental approval granted
Status since26 Feb 2024
Application filed22 Nov 2023
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantSps Steels Rolling Mills Limited
Land area320.6 acres (129.8 ha)
Project cost₹3,565 crore
Village / localityBabuijor
Taluk / tehsilSanturi
DistrictPuruliya
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00104

In context

33 applications in Puruliya since January 2022 are in the same category (Industry): 22 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 320.6 acres, this one is larger than 64% of them.

Where it is

Babuijor, Santuri, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Sps Steels Rolling Mills projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.