Quick answers
What is this project?
Proposed DVC, Raghunathpur Thermal Power Project-PH-II (2x660 MW) is a proposed power project in Goaladi, Raghunathpur - I, Puruliya, West Bengal. The site covers 2,077 acres.
Who is building it?
The applicant is Damodar Valley Corporation.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Mar 2023), as of 27 Nov 2026.
Where is it?
In Goaladi, Raghunathpur - I, Puruliya, West Bengal.
How big is it?
It has a stated cost of ₹11,554.3 crore and a site of 2,077 acres.
When was it filed?
The application was filed on 6 Mar 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Mar 2023 |
| Application filed | 6 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Power |
| Applicant | Damodar Valley Corporation |
| Land area | 2,077 acres (840.5 ha) |
| Project cost | ₹11,554.3 crore |
| Village / locality | Goaladi |
| Taluk / tehsil | Raghunathpur - I |
| District | Puruliya |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00173 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Goaladi, Raghunathpur - I, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed DVC, Raghunathpur Thermal Power Project-PH-II (2x660 MW) — environmental approval granted, 0 m away
- Integrated Steel Plant of 09 Million Ton Per Annum (finished steel) with 1260… — under environmental review, 4.3 km away
- Integrated Steel Plant of 09 Million Ton Per Annum (finished steel) with 1260… — withdrawn, 4.3 km away
- Integrated Steel Plant of 4.5 Million Tpa (Finished Steel) With 680 MW Captive… — withdrawn, 4.3 km away
- Iron Ore Beneficiation Plant (2x1.5 MTPA) - 3.0 MTPA, Pellet Plant (2 x 1.2… — environmental approval granted, 7.4 km away
- Greenfield Steel Plant for production of 51500TPA(Max) Ferro Alloys by 2x9MVA… — environmental approval granted, 8.4 km away
- Greenfield Steel Plant for production of 51500TPA(Max) Ferro Alloys by 2x9MVA… — cleared for impact study, 8.4 km away
- Upardanga Granite Stone Quarry — environmental approval granted, 8.7 km away
More from Damodar Valley Corporation in Puruliya
- Proposed DVC, Raghunathpur Thermal Power Project-PH-II (2x660 MW) — environmental approval granted
All 16 Damodar Valley Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.