Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 17 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Rajeev Bhalla |
| Land area | 41.2 acres (16.7 ha) |
| Project cost | ₹499.7 crore |
| Village / locality | Sajara |
| Taluk / tehsil | Faridpur Durgapur |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00265 |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 41.2 acres, this one is larger than 60% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sajara, Faridpur Durgapur, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for the Expansion Project of Durgapur Cement Works From… — cleared for impact study, 0 m away
- Brownfield Expansion of Durgapur Steel Plant, Steel Authority of India Limited… — lapsed, 2.6 km away
- Brownfield Expansion of Durgapur Steel Plant, Steel Authority of India Limited… — cleared for impact study, 2.6 km away
- Revised Configuration of Modernisation-cum-expansion (3.5MTPA to 2.7MTPA Gross… — environmental approval granted, 2.6 km away
- Revised Configuration of Modernisation-cum-expansion (3.5 MTPA to 2.7 MTPA… — withdrawn, 2.6 km away
- Upgradation of Billet Casters — initial checks, 2.7 km away
- Power project by M/S NTPC-SAIL Power Company Ltd. CPP-II (2 X 60MW) at DSP… — lapsed, 3.3 km away
- Proposed Group Housing Project of G+13 Storied Residential Building at L.R. &… — under environmental review, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.