Quick answers
What is this project?
Setting up a Common Bio-Medical Waste Treatment and Disposal Facility (CBWTF) by M/s. RVD Waste Tech Private Limited (RVDWTPL) at Plot No. R.S. & L.R. 262, J.L. No. 18, Mouza: Bhupatipur, P.S.: Jagatballabpur, Dist.: Howrah, West Bengal is an approved waste management project in Bhupatipur, Jagatballavpur, Howrah, West Bengal. The site covers 2.1 acres.
Who is building it?
The applicant is M/S. Rvd Waste Tech PVT. LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Nov 2023), as of 27 Nov 2026.
Where is it?
In Bhupatipur, Jagatballavpur, Howrah, West Bengal.
How big is it?
It has a stated cost of ₹10 crore and a site of 2.1 acres.
When was it filed?
The application was filed on 7 Nov 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Nov 2023 |
| Application filed | 7 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Waste management |
| Applicant | M/S. Rvd Waste Tech PVT. LTD. |
| Land area | 2.1 acres (0.9 ha) |
| Project cost | ₹10 crore |
| Village / locality | Bhupatipur |
| Taluk / tehsil | Jagatballavpur |
| District | Howrah |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00318 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhupatipur, Jagatballavpur, Howrah, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Setting up manufacturing unit of 10200 TPA of Urea-Formaldehyde Resin, 4200… — cleared for impact study, 750 m away
- Foundry Park (Industrial Park for Non-Toxic Secondary Metallurgical Units) at… — not approved, 8.8 km away
- Foundry Park (Industrial Park for Non-Toxic Secondary Metallurgical Units) at… — environmental approval granted, 8.9 km away
- Industrial project by Amtek Projects Private Limited — not approved, 10.1 km away
- Proposed Distillation & Solvent Manufacturing Unit (50 KLPD) at Plot Nos.… — returned to applicant, 11.8 km away
- Environment Clearance of Proposed manufacturing unit of Ambrettolide – 50 TPA… — environmental approval granted, 11.9 km away
- Environment Clearance of Proposed manufacturing unit of Ambrettolide – 50 TPA… — cleared for impact study, 11.9 km away
- Structural Hot Rolling Mill Plant located at L.R. Khatian Number-1210, L.R.… — cleared for impact study, 14 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.