Quick answers
What is this project?
Environment Clearance of Proposed manufacturing unit of Ambrettolide – 50 TPA (i.e. a synthetic macrocyclic musk compound) located at OM Industrial Complex, J.L. No. 12, Dag No. 3820, 3821, Village & Post Office – Deulpur, P.S.- Panchla, District - Howrah, West Bengal-711411 is a proposed industrial project in Deulpur (Ct), Panchla, Howrah, West Bengal. The site covers 0.6 acres.
Who is building it?
The applicant is Senteur Aromatics Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 12 Aug 2024), as of 27 Nov 2026.
Where is it?
In Deulpur (Ct), Panchla, Howrah, West Bengal.
How big is it?
It has a stated cost of ₹5.5 crore and a site of 0.6 acres.
When was it filed?
The application was filed on 28 Jun 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Environment Clearance of Proposed manufacturing unit of Ambrettolide – 50 TPA (i.e. a…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 12 Aug 2024 |
| Application filed | 28 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Senteur Aromatics Private Limited |
| Land area | 2,500 m² |
| Project cost | ₹5.5 crore |
| Village / locality | Deulpur (Ct) |
| Taluk / tehsil | Panchla |
| District | Howrah |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00568 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 May 2025 | Environmental approval granted | 0.6 acres | ₹5.5 crore |
| Early planning filed 28 Jun 2024 (this page) | Cleared for impact study | 0.6 acres | ₹5.5 crore |
In context
35 applications in Howrah since January 2022 are in the same category (Industry): 25 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.6 acres, this one is smaller than 94% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Deulpur (Ct), Panchla, Howrah, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance of Proposed manufacturing unit of Ambrettolide – 50 TPA… — environmental approval granted, 0 m away
- Structural Hot Rolling Mill Plant located at L.R. Khatian Number-1210, L.R.… — cleared for impact study, 2.9 km away
- Environmental Clearance of existing Rolling Mill for production of 1500 Ton… — cleared for impact study, 3.3 km away
- Proposed Distillation & Solvent Manufacturing Unit (50 KLPD) at Plot Nos.… — returned to applicant, 3.7 km away
- Environmental Clearance of existing Rolling Mill for production of 1500 Ton… — cleared for impact study, 4.2 km away
- NIPL Application of Ambuja Cements Ltd. (Unit - Sankrail) — initial checks, 4.2 km away
- Expansion of Existing Cement Grinding Unit from 2.4 to 4.0 MTPA — environmental approval granted, 4.4 km away
- Industrial project by Salasar Rolling Mills PVT LTD — cleared for impact study, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.