What is this project?
Structural Hot Rolling Mill Plant located at L.R. Khatian Number-1210, L.R. Plot No. 1186, 1188, 1189,1191, 1192, 1305, 1306, J.L. No. 03, Mouza-Sulati, P.S.-Sankrail, P.O.-Dhulagori, District-Howrah, West Bengal-711302 by M/s Modern Ispat Private Limited is a proposed industrial project in Bankul, Sankrail, Howrah, West Bengal. The site covers 0.7 acres.
Who is building it?
The applicant is Modern Ispat Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 Sept 2023), as of 27 Nov 2026.
Where is it?
In Bankul, Sankrail, Howrah, West Bengal.
How big is it?
It has a stated cost of ₹7.4 crore and a site of 0.7 acres.
When was it filed?
The application was filed on 25 Sept 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Sept 2023 |
| Application filed | 25 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Modern Ispat Private Limited |
| Land area | 3,000 m² |
| Project cost | ₹7.4 crore |
| Village / locality | Bankul |
| Taluk / tehsil | Sankrail |
| District | Howrah |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00437 |
In context
35 applications in Howrah since January 2022 are in the same category (Industry): 25 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.7 acres, this one is smaller than 88% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bankul, Sankrail, Howrah, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance of existing Rolling Mill for production of 1500 Ton… — cleared for impact study, 700 m away
- Environmental Clearance of existing Rolling Mill for production of 1500 Ton… — cleared for impact study, 1.7 km away
- NIPL Application of Ambuja Cements Ltd. (Unit - Sankrail) — initial checks, 2.3 km away
- Expansion of Existing Cement Grinding Unit from 2.4 to 4.0 MTPA — environmental approval granted, 2.3 km away
- Proposed Cold Rolling Mill Complex (Unit V) for Total Production Capacity… — environmental approval granted, 2.5 km away
- Proposed Cold Rolling Mill Complex (Unit V) for Total Production Capacity… — environmental approval granted, 2.5 km away
- Proposed Cold Rolling Mill Complex (Unit V) for Total Production Capacity… — cleared for impact study, 2.5 km away
- Environment Clearance of Proposed manufacturing unit of Ambrettolide – 50 TPA… — environmental approval granted, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.