Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Aug 2023 |
| Application filed | 25 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Manbhum Ispat Private Limited |
| Land area | 5.8 acres (2.3 ha) |
| Project cost | ₹31.4 crore |
| Village / locality | Mangalpur |
| Taluk / tehsil | Raniganj |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site area on record |
| Our reference | WID-WB-00369 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Apr 2024 | Lapsed | 5.8 acres | ₹31.4 crore |
| Early planning filed 25 Aug 2023 (this page) | Cleared for impact study | 5.8 acres | ₹31.4 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.8 acres, this one is smaller than 91% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mangalpur, Raniganj, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for Existing 62,400 TPA Hot Rolling Mill for production… — lapsed, 0 m away
- Proposed Expansion cum modification of Existing Steel Plant — returned to applicant, 550 m away
- Proposed Expansion cum modification of Existing Steel Plant — lapsed, 550 m away
- Expansion Under 7(Ii)(A) in the Existing Steel Plant by Increasing the… — returned to applicant, 700 m away
- Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000… — environmental approval granted, 700 m away
- Expansion In The Production Capacity Of Rolling Mill From 60,000 Tpa To 72,000… — environmental approval granted, 700 m away
- Expansion Cum Amendment Under 7(Ii)(A) in the Existing Steel Plant by… — under environmental review, 700 m away
- Expansion in Sponge Iron Production from 49,500 TPA to 1, 22,100 TPA by M/s… — environmental approval granted, 700 m away
All 4 Manbhum Ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.