Quick answers
What is this project?
Expansion of Existing Cement Grinding Unit from 2.4 to 4.0 MTPA is an approved industrial project in Jala Dhulagiri, Sankrail, Howrah, West Bengal. The site covers 80.7 acres.
Who is building it?
The applicant is Ambuja Cement Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 May 2023), as of 27 Nov 2026.
Where is it?
In Jala Dhulagiri, Sankrail, Howrah, West Bengal.
How big is it?
It has a stated cost of ₹6.5 crore and a site of 80.7 acres.
When was it filed?
The application was filed on 27 May 2023.
Project details
| Official title | Expansion of Existing Cement Grinding Unit from 2.4 to 4.0 MTPA at Village- Jala Dhulagori, Tehsil-Sankrail, District-Howrah (West Bengal) by M/s. Ambuja Cements Limited (Unit: Sankrail). |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 May 2023 |
| Application filed | 27 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Ambuja Cement Limited |
| Land area | 80.7 acres (32.6 ha) |
| Project cost | ₹6.5 crore |
| Village / locality | Jala Dhulagiri |
| Taluk / tehsil | Sankrail |
| District | Howrah |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00403 |
In context
35 applications in Howrah since January 2022 are in the same category (Industry): 25 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 80.7 acres, this one is larger than 88% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jala Dhulagiri, Sankrail, Howrah, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- NIPL Application of Ambuja Cements Ltd. (Unit - Sankrail) — initial checks, 300 m away
- Environmental Clearance of existing Rolling Mill for production of 1500 Ton… — cleared for impact study, 750 m away
- Proposed Greenfield Project for Active Pharmaceutical Ingredients (APIs)… — cleared for impact study, 1.6 km away
- Environmental Clearance of existing Rolling Mill for production of 1500 Ton… — cleared for impact study, 1.6 km away
- Structural Hot Rolling Mill Plant located at L.R. Khatian Number-1210, L.R.… — cleared for impact study, 2.3 km away
- Industrial buildings (Low Hazard) by Srijan Realty Private Limited — environmental approval granted, 2.7 km away
- Industrial project by Salasar Rolling Mills PVT LTD — cleared for impact study, 2.9 km away
- Manufacturing of 216000 TPA Hot Rolled structural items/ TMT Re-bars, 75,000… — not approved, 4 km away
All 26 Ambuja Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.