Quick answers
What is this project?
Environmental Clearance of existing Rolling Mill for production of 1500 Ton per month Re-rolled products (Flats, Rounds, Angles, Channels etc.) at Sankrail Industrial Park, Vill - Bhagabatipur, P.S - Sankrail, Howrah - 711302 by M/s. Giriraj Ispat Pvt. Ltd. (Unit - 2) is a proposed industrial project in Bhagabatipur, Sankrail, Howrah, West Bengal. The site covers 2.2 acres.
Who is building it?
The applicant is Giriraj Ispat Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 Mar 2024), as of 27 Nov 2026.
Where is it?
In Bhagabatipur, Sankrail, Howrah, West Bengal.
How big is it?
It has a stated cost of ₹3.7 crore and a site of 2.2 acres.
When was it filed?
The application was filed on 11 Jan 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 Mar 2024 |
| Application filed | 11 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Giriraj Ispat Private Limited |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹3.7 crore |
| Village / locality | Bhagabatipur |
| Taluk / tehsil | Sankrail |
| District | Howrah |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00593 |
In context
35 applications in Howrah since January 2022 are in the same category (Industry): 25 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.2 acres, this one is smaller than 71% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhagabatipur, Sankrail, Howrah, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Cement Grinding Unit from 2.4 to 4.0 MTPA — environmental approval granted, 750 m away
- NIPL Application of Ambuja Cements Ltd. (Unit - Sankrail) — initial checks, 950 m away
- Environmental Clearance of existing Rolling Mill for production of 1500 Ton… — cleared for impact study, 1 km away
- Structural Hot Rolling Mill Plant located at L.R. Khatian Number-1210, L.R.… — cleared for impact study, 1.7 km away
- Proposed Greenfield Project for Active Pharmaceutical Ingredients (APIs)… — cleared for impact study, 2.3 km away
- Proposed Cold Rolling Mill Complex (Unit V) for Total Production Capacity… — environmental approval granted, 3.3 km away
- Proposed Cold Rolling Mill Complex (Unit V) for Total Production Capacity… — environmental approval granted, 3.3 km away
- Proposed Cold Rolling Mill Complex (Unit V) for Total Production Capacity… — cleared for impact study, 3.3 km away
More from Giriraj Ispat Private Limited in Howrah
- Environmental Clearance of existing Rolling Mill for production of 1500 Ton… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.