Quick answers
What is this project?
Proposed 0.13 MTPA Ferro Alloys Plant (6 X 9 MVA SAF, 2X6 T EAF, 2X15 T AOD, 2X9 T HF & 2000 TPM Thermic Process with supporting units such as 18000 TPA Sinter Plant, 1 X 5 TPH & 2 X 6 TPH Briquetting unit & 10000 TPM Slag recovery unit) is a proposed industrial project in Ghutgarya (Ct), Barjora, Bankura, West Bengal. The site covers 27.7 acres.
Who is building it?
The applicant is Lalwani Ferro Alloys Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Ghutgarya (Ct), Barjora, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹258.9 crore and a site of 27.7 acres.
When was it filed?
The application was filed on 12 Aug 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 0.13 MTPA Ferro Alloys Plant (6 X 9 MVA SAF, 2X6 T EAF, 2X15 T AOD, 2X9 T HF &…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 12 Aug 2024 |
| Application filed | 12 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Lalwani Ferro Alloys Limited |
| Land area | 27.7 acres (11.2 ha) |
| Project cost | ₹258.9 crore |
| Village / locality | Ghutgarya (Ct) |
| Taluk / tehsil | Barjora |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00486 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Feb 2025 | Environmental approval granted | 13.9 acres | ₹258.9 crore |
| Early planning filed 12 Aug 2024 (this page) | Under environmental review | 27.7 acres | ₹258.9 crore |
In context
69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 27.7 acres, this one is larger than 63% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghutgarya (Ct), Barjora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application of "No Increase in Pollution Load" Certificate for change in… — initial checks, 250 m away
- Application of "No Increase in Pollution Load" Certificate for change in… — initial checks, 250 m away
- Proposed Expansion by installing Rolling Mill Plant for Production of TMT,… — environmental approval granted, 250 m away
- Proposed Expansion by installing Rolling Mill Plant for Production of TMT,… — cleared for impact study, 250 m away
- Proposed 0.13 MTPA Ferro Alloys Plant (6 X 9 MVA SAF, 2X6 T EAF, 2X15 T AOD,… — environmental approval granted, 350 m away
- Proposed Ferro Alloy Plant — under environmental review, 350 m away
- Expansion of Existing Secondary Metallurgical Unit by Installing Additional… — cleared for impact study, 950 m away
- Industrial project by SBEG Consultants Pvt. Ltd. — lapsed, 1.3 km away
More from Lalwani Ferro Alloys Limited in Bankura
- Proposed Ferro Alloy Plant — under environmental review
All 3 Lalwani Ferro Alloys projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.