Quick answers
What is Industrial project by SBEG Consultants Pvt. Ltd.?
This lapsed industrial project by SBEG Consultants Pvt. Ltd. is in Salkhara, Barjora, Bankura, West Bengal. The site covers 11.2 acres.
Who is building it?
The applicant is Sbeg Consultants Private Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Salkhara, Barjora, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹15 crore and a site of 11.2 acres.
When was it filed?
The application was filed on 24 Jan 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 24 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sbeg Consultants Private Limited |
| Land area | 11.2 acres (4.6 ha) |
| Project cost | ₹15 crore |
| Village / locality | Salkhara |
| Taluk / tehsil | Barjora |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00642 |
In context
69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.2 acres, this one is smaller than 75% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Salkhara, Barjora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion project by installation of 4X30 T Induction Furnaces… — environmental approval granted, 200 m away
- Expansion of Existing Secondary Metallurgical Unit by Installing Additional… — cleared for impact study, 600 m away
- Diversion of Forest Land at Mouza-Saharjora (Plasto Steel Park) for Setting of… — not approved, 900 m away
- Proposed 0.13 MTPA Ferro Alloys Plant (6 X 9 MVA SAF, 2X6 T EAF, 2X15 T AOD,… — environmental approval granted, 1 km away
- Environment Clearance (in compliance of the NGT order dt. 12.02.2020 in… — cleared for impact study, 1.1 km away
- Proposed 0.13 MTPA Ferro Alloys Plant (6 X 9 MVA SAF, 2X6 T EAF, 2X15 T AOD,… — under environmental review, 1.3 km away
- Transfer of Environmental Clearance (EC) granted by the Ministry of… — returned to applicant, 1.4 km away
- Transfer of Environmental Clearance (EC) granted by the Ministry of… — returned to applicant, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.