Quick answers
What is this project?
Proposed 0.13 MTPA Ferro Alloys Plant (6 X 9 MVA SAF, 2X6 T EAF, 2X15 T AOD, 2X9 T HF & 2000 TPM Thermic Process with supporting units such as 18000 TPA Sinter Plant, 1 X 5 TPH & 2 X 6 TPH Briquetting unit & 10000 TPM Slag recovery unit) is an approved industrial project in Ghutgarya (Ct), Barjora, Bankura, West Bengal. The site covers 13.9 acres.
Who is building it?
The applicant is Lalwani Ferro Alloys Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 May 2025), as of 27 Nov 2026.
Where is it?
In Ghutgarya (Ct), Barjora, Bankura, West Bengal.
How big is it?
It has a stated cost of ₹258.9 crore and a site of 13.9 acres.
When was it filed?
The application was filed on 11 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 May 2025 |
| Application filed | 11 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Lalwani Ferro Alloys Limited |
| Land area | 13.9 acres (5.6 ha) |
| Project cost | ₹258.9 crore |
| Village / locality | Ghutgarya (Ct) |
| Taluk / tehsil | Barjora |
| District | Bankura |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00602 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Feb 2025 (this page) | Environmental approval granted | 13.9 acres | ₹258.9 crore |
| Early planning filed 12 Aug 2024 | Under environmental review | 27.7 acres | ₹258.9 crore |
In context
69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 13.9 acres, this one is smaller than 66% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghutgarya (Ct), Barjora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 0.13 MTPA Ferro Alloys Plant (6 X 9 MVA SAF, 2X6 T EAF, 2X15 T AOD,… — under environmental review, 350 m away
- Application of "No Increase in Pollution Load" Certificate for change in… — initial checks, 550 m away
- Application of "No Increase in Pollution Load" Certificate for change in… — initial checks, 550 m away
- Proposed Expansion by installing Rolling Mill Plant for Production of TMT,… — environmental approval granted, 550 m away
- Proposed Expansion by installing Rolling Mill Plant for Production of TMT,… — cleared for impact study, 550 m away
- Expansion of Existing Secondary Metallurgical Unit by Installing Additional… — cleared for impact study, 650 m away
- Proposed Ferro Alloy Plant — under environmental review, 650 m away
- Industrial project by SBEG Consultants Pvt. Ltd. — lapsed, 1 km away
More from Lalwani Ferro Alloys Limited in Bankura
- Proposed Ferro Alloy Plant — under environmental review
All 3 Lalwani Ferro Alloys projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.