One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Capacity Enhancement (40% Maximum in Two Stages of Maximum 20% Each) of the…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 14 Dec 2024 |
| Application filed | 13 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Gaurav Jajodia |
| Land area | 180 acres (72.8 ha) |
| Project cost | ₹658.7 crore |
| Village / locality | Bamunara |
| Taluk / tehsil | Kanksa |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00840 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 24 Jan 2025 | Environmental approval granted | 180 acres | ₹658.7 crore |
| Early planning filed 13 Dec 2024 (this page) | Withdrawn | 180 acres | ₹658.7 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 180 acres, this one is larger than 79% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bamunara, Kanksa, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion cum modification of existing Steel Plant by modification of existing… — under environmental review, 0 m away
- Expansion cum modification of existing Steel Plant by modification of existing… — cleared for impact study, 0 m away
- Proposed Capacity Enhancement (40% Maximum in Two Stages of Maximum 20% Each)… — environmental approval granted, 0 m away
- Proposed Expansion of Existing Steel Plant by enhancement of Production… — returned to applicant, 0 m away
- Expansion of existing steel plant 2 x 6 Tonne to 4 x 25 Tonne Induction… — cleared for impact study, 1 km away
- 4 x 20 Tonnes Induction furnaces with Ladle Refining Furnace, CCM and… — lapsed, 1.1 km away
- 4 x 20 Tonnes Induction furnaces with Ladle Refining Furnace, CCM and… — environmental approval granted, 1.1 km away
- "No Increase in Pollution Load" Certificate for configuration change in… — initial checks, 1.1 km away
More from Gaurav Jajodia in Paschim Bardhaman
- Proposed Expansion cum Modification of Existing Steel Plant. — environmental approval granted
- Proposed Expansion cum Modification of Existing Steel Plant. — cleared for impact study
- Proposed Expansion cum Modification of Existing Steel Plant. — returned to applicant
- Proposed Expansion of Existing Steel Plant by enhancement of Production… — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.