Quick answers
What is this project?
Proposed Expansion of existing Calcined Petroleum Coke plant by installation of 72,000 TPA Electrically Calcined Anthracite Plant, 60,000 TPA Coal Tar Distillation Plant and by revamping of Old Carbon Paste Plant is a proposed industrial project in Dhanyaghata, Haldia, Purba Medinipur, West Bengal. The site covers 29.8 acres.
Who is building it?
The applicant is Petro Carbon and Chemicals Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Nov 2024), as of 27 Nov 2026.
Where is it?
In Dhanyaghata, Haldia, Purba Medinipur, West Bengal.
How big is it?
It has a stated cost of ₹141.5 crore and a site of 29.8 acres.
When was it filed?
The application was filed on 16 Sept 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of existing Calcined Petroleum Coke plant by installation of 72,000…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Nov 2024 |
| Application filed | 16 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Petro Carbon and Chemicals Limited |
| Land area | 29.8 acres (12.1 ha) |
| Project cost | ₹141.5 crore |
| Village / locality | Dhanyaghata |
| Taluk / tehsil | Haldia |
| District | Purba Medinipur |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00594 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 28 Feb 2025 | Environmental approval granted | 29.8 acres | ₹141.5 crore |
| Early planning filed 16 Sept 2024 (this page) | Cleared for impact study | 29.8 acres | ₹141.5 crore |
In context
27 applications in Purba Medinipur since January 2022 are in the same category (Industry): 12 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 29.8 acres, this one is smaller than 56% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhanyaghata, Haldia, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of existing Calcined Petroleum Coke plant by installation… — environmental approval granted, 0 m away
- Expansion of existing Calcined Petroleum Coke plant of 93,744 TPA capacity by… — lapsed, 0 m away
- Ferro-Alloy Plant (SAF 4x9 MVA) and Chrome Ore Briquetting Plant (2x10 TPH) at… — cleared for impact study, 450 m away
- Ferro-Alloy Plant (SAF 4x9 MVA) and Chrome Ore Briquetting Plant (2x10 TPH) at… — returned to applicant, 550 m away
- Ferro-Alloy Plant (SAF 4x9 MVA) and Chrome Ore Briquetting Plant (2x10 TPH) at… — cleared for impact study, 550 m away
- A) Laying of Phenol Pipeline from HPL plant facility to Finger Jetty. B)… — coastal clearance granted, 700 m away
- Aaa — under environmental review, 850 m away
- Environmental Clearance for Increase in Propylene, Phenol and Acetone (within… — environmental approval granted, 900 m away
All 7 Petro Carbon and Chemicals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.