What is Developing? Open the mapMap

Environmental approval grantedIndustry · Purba Medinipur, West Bengal

Proposed Expansion of existing Calcined Petroleum Coke plant by installation of 72,000 TPA Electrically Calcined Anthracite Plant, 60,000 TPA Coal Tar Distillation Plant and by revamping of Old Carbon Paste Plant

Proposed Expansion of existing Calcined Petroleum Coke plant by installation of 72,000 TPA Electrically Calcined Anthracite Plant, 60,000 TPA Coal Tar Distillation Plant and by revamping of Old Carbon Paste Plant is an approved industrial project in Dhanyaghata, Haldia, Purba Medinipur, West Bengal. The site covers 29.8 acres. Its stated project cost is ₹141.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 25 Apr 2025).

See it on the live map All projects in Purba Medinipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of existing Calcined Petroleum Coke plant by installation of 72,000 TPA Electrically Calcined Anthracite Plant, 60,000 TPA Coal Tar Distillation Plant and by revamping of Old Carbon Paste Plant is an approved industrial project in Dhanyaghata, Haldia, Purba Medinipur, West Bengal. The site covers 29.8 acres.

Who is building it?

The applicant is Petro Carbon and Chemicals Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 25 Apr 2025), as of 27 Nov 2026.

Where is it?

In Dhanyaghata, Haldia, Purba Medinipur, West Bengal.

How big is it?

It has a stated cost of ₹141.5 crore and a site of 29.8 acres.

When was it filed?

The application was filed on 28 Feb 2025.

Project details

StatusEnvironmental approval granted
Status since25 Apr 2025
Application filed28 Feb 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantPetro Carbon and Chemicals Limited
Land area29.8 acres (12.1 ha)
Project cost₹141.5 crore
Village / localityDhanyaghata
Taluk / tehsilHaldia
DistrictPurba Medinipur
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01537

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 28 Feb 2025 (this page)Environmental approval granted29.8 acres₹141.5 crore
Early planning filed 16 Sept 2024Cleared for impact study29.8 acres₹141.5 crore

In context

27 applications in Purba Medinipur since January 2022 are in the same category (Industry): 12 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 29.8 acres, this one is smaller than 56% of them.

31 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dhanyaghata, Haldia, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 7 Petro Carbon and Chemicals projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.