Expansion of existing Calcined Petroleum Coke plant of 93,744 TPA capacity by installing 1 Vertical Shaft Calcination Kiln (2,00,000 TPA capacity), 8 Furnaces for Electrically Calcined Anthracite Plant (75,000 TPA Capacity), 8 Furnaces for Graphitazion of Calcined Petroleum Coke (4 Furnaces for Foundry Grade & 4 Furnaces for Anode Grade) and Reviving of Old Carbon Paste Plant (75,000 TPA Capacity)

Expansion of existing Calcined Petroleum Coke plant of 93,744 TPA capacity by installing 1 Vertical Shaft Calcination Kiln (2,00,000 TPA capacity), 8 Furnaces for Electrically Calcined Anthracite Plant (75,000 TPA Capacity), 8 Furnaces for Graphitazion of Calcined Petroleum Coke (4 Furnaces for Foundry Grade & 4 Furnaces for Anode Grade) and Reviving of Old Carbon Paste Plant (75,000 TPA Capacity) is a lapsed industrial project in Dhanyaghata, Haldia, Purba Medinipur, West Bengal. The site covers 25 acres. Its stated project cost is ₹494.2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 27 Jul 2025).

See it on the live map All projects in Purba Medinipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of existing Calcined Petroleum Coke plant of 93,744 TPA capacity by installing 1 Vertical Shaft Calcination Kiln (2,00,000 TPA capacity), 8 Furnaces for Electrically Calcined Anthracite Plant (75,000 TPA Capacity), 8 Furnaces for Graphitazion of Calcined Petroleum Coke (4 Furnaces for Foundry Grade & 4 Furnaces for Anode Grade) and Reviving of Old Carbon Paste Plant (75,000 TPA Capacity) is a lapsed industrial project in Dhanyaghata, Haldia, Purba Medinipur, West Bengal. The site covers 25 acres.

Who is building it?

The applicant is Petro Carbon and Chemicals Private Limited.

Has it been approved?

No. The application was lapsed on 27 Jul 2025, so it is no longer under consideration.

Where is it?

In Dhanyaghata, Haldia, Purba Medinipur, West Bengal.

How big is it?

It has a stated cost of ₹494.2 crore and a site of 25 acres.

When was it filed?

The application was filed on 8 Feb 2024.

Project details

StatusLapsed
Status since27 Jul 2025
Application filed8 Feb 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantPetro Carbon and Chemicals Private Limited
Land area25 acres (10.1 ha)
Project cost₹494.2 crore
Village / localityDhanyaghata
Taluk / tehsilHaldia
DistrictPurba Medinipur
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00473

In context

27 applications in Purba Medinipur since January 2022 are in the same category (Industry): 12 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 25 acres, this one is smaller than 59% of them.

32 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dhanyaghata, Haldia, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Petro Carbon and Chemicals Private Limited in Purba Medinipur

All 7 Petro Carbon and Chemicals projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.