Project details
| Official title | Transfer of Environment Clearance (EC) granted by MoEF&CC, New Delhi Vide F.No. J-11011/20/2008-IA-II.(I), dated:-04.06.2009 for Setting up Ferro Alloy plant (2 x 9 MVA SAF) at Village - Maheshpur, P.S. + P.O. - Salanpur, Dist - Paschim Bardhman, West Bengal by M/s Maa Sherawali Ispat Pvt Ltd. in favour of M/s Shree Ramdoot Metloys Private Limited |
|---|---|
| Status | Lapsed |
| Status since | 9 Jun 2025 |
| Application filed | 9 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Shree Ramdoot Metloys Private Limited |
| Land area | 6 acres (2.4 ha) |
| Project cost | ₹28.7 crore |
| Village / locality | Maheshpur |
| Taluk / tehsil | Salanpur |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00713 |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6 acres, this one is smaller than 89% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Maheshpur, Salanpur, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Steel plant for production of 4,29,000 TPA Sponge Iron, 4,12,500 TPA MS… — under environmental review, 650 m away
- Steel plant for the production of 4,29,000 TPA Sponge Iron, 4,12,500 TPA MS… — withdrawn, 650 m away
- Expansion of Ferro Alloy plant production from 12,650 MTPA to 66,650 TPA… — lapsed, 900 m away
- Expansion of Ferro Alloy plant production from 12,650 MTPA to 66,650 TPA… — cleared for impact study, 900 m away
- Maheshpur Black Stone Mine — environmental approval granted, 1.2 km away
- Change of Configuration of Induction Furnace from 6x8 Ton to 1x25 Ton and 1x23… — initial checks, 1.4 km away
- Modification in existing EC for installation of two Induction Furnaces i.e.… — initial checks, 1.4 km away
- Change in the configuration of Induction Furnace by replacing 4x25T with… — initial checks, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.