What is Developing? Open the mapMap

LapsedIndustry · Paschim Bardhaman, West Bengal

Expansion of Ferro Alloy plant production from 12,650 MTPA to 66,650 TPA either or in combination of Ferro-manganese, Ferro-chrome, Ferro-silicon, Silico-manganese by addition of 3x9MVA Submerged Arc Furnace with existing 1x3 MVA & 1x5 MVA SAF, Proposed productions of MS Billets (IF with LF & CCM) 144000 TPA by installing 4x15 Tons IF, Rolling Mill is 120000 TPA alongwith RF of 20 TPH at Vill/Mouza- Nakrajoria, PO+PS-Salanpur, Dist. Burdwan(W)Pin-713357,W.B. by M/s Asansol Alloys Pvt. Ltd.

Expansion of Ferro Alloy plant production from 12,650 MTPA to 66,650 TPA either or in combination of Ferro-manganese, Ferro-chrome, Ferro-silicon, Silico-manganese by addition of 3x9MVA Submerged Arc Furnace with existing 1x3 MVA & 1x5 MVA SAF, Proposed productions of MS Billets (IF with LF & CCM) 144000 TPA by installing 4x15 Tons IF, Rolling Mill is 120000 TPA alongwith RF of 20 TPH at Vill/Mouza- Nakrajoria, PO+PS-Salanpur, Dist. Burdwan(W)Pin-713357,W.B. by M/s Asansol Alloys Pvt. Ltd is a lapsed industrial project in Nekrajuria, Salanpur, Paschim Bardhaman, West Bengal. The site covers 13.4 acres. Its stated project cost is ₹133.6 crore. As of 27 Nov 2026, its status is “Lapsed” (since 5 Aug 2026).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Ferro Alloy plant production from 12,650 MTPA to 66,650 TPA either or in…

Project details

StatusLapsed
Status since5 Aug 2026
Application filed29 Apr 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantAsansol Alloys Private Limited
Land area13.4 acres (5.4 ha)
Project cost₹133.6 crore
Village / localityNekrajuria
Taluk / tehsilSalanpur
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01583

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 29 Apr 2026 (this page)Lapsed13.4 acres₹133.6 crore
Early planning filed 13 Feb 2024Cleared for impact study13.4 acres₹133.6 crore

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 13.4 acres, this one is smaller than 76% of them.

13 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nekrajuria, Salanpur, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.