Project details
| Official title | Establishment of steel plant for production of 4,29,000 TPA Sponge Iron, 4,12,500 TPA MS Billets, 3,96,000 TPA MS Rolled Products, 1,07,136 TPA Pig Iron (max.) or 97,030 TPA (max.) Ferro Alloys or in combination of any from SAF with 1,65,000 TPA Briquettes, 1,65,000 TPA Sinter and 90 MW Captive Power Plant along with allied facilities by M/s Maa Kali Steel & Power Private Limited at Village: Srirampur, PO & PS: Salanpur, District: Paschim Bardhaman, West Bengal |
|---|---|
| Status | Under environmental review |
| Status since | 18 Aug 2026 |
| Application filed | 13 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Maa Kali Steel & Power Private Limited |
| Land area | 37.1 acres (15 ha) |
| Project cost | ₹965 crore |
| Village / locality | Nekrajuria |
| Taluk / tehsil | Salanpur |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01751 |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 37.1 acres, this one is larger than 56% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nekrajuria, Salanpur, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Steel plant for the production of 4,29,000 TPA Sponge Iron, 4,12,500 TPA MS… — withdrawn, 0 m away
- Transfer of Environment Clearance (EC) granted by MoEF&CC, New Delhi Vide… — lapsed, 650 m away
- Change of Configuration of Induction Furnace from 6x8 Ton to 1x25 Ton and 1x23… — initial checks, 900 m away
- Modification in existing EC for installation of two Induction Furnaces i.e.… — initial checks, 900 m away
- Expansion of Ferro Alloy plant production from 12,650 MTPA to 66,650 TPA… — lapsed, 950 m away
- Expansion of Ferro Alloy plant production from 12,650 MTPA to 66,650 TPA… — cleared for impact study, 950 m away
- Expansion of Steel Melting Shop (3,75,000 TPA to 8,89,000 TPA), Rolling Mill… — environmental approval granted, 1.4 km away
- Maheshpur Black Stone Mine — environmental approval granted, 1.7 km away
More from Maa Kali Steel & Power Private Limited in Paschim Bardhaman
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.