What is Developing? Open the mapMap

Returned to applicantIndustry · Purba Medinipur, West Bengal

2nd Catalytic Iso Dewaxing unit of capacity 270 TMTPA (Thousand Metric Ton Per Annum), by IOCL

2nd Catalytic Iso Dewaxing unit of capacity 270 TMTPA (Thousand Metric Ton Per Annum), by IOCL is a proposed industrial project in Gadadhar Chak, Haldia, Purba Medinipur, West Bengal. The site covers 4.8 acres. Its stated project cost is ₹967 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 30 Apr 2026).

See it on the live map All projects in Purba Medinipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

2nd Catalytic Iso Dewaxing unit of capacity 270 TMTPA (Thousand Metric Ton Per Annum), by IOCL is a proposed industrial project in Gadadhar Chak, Haldia, Purba Medinipur, West Bengal. The site covers 4.8 acres.

Who is building it?

The applicant is Indian Oil Corporation Limited (IOCL).

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Gadadhar Chak, Haldia, Purba Medinipur, West Bengal.

How big is it?

It has a stated cost of ₹967 crore and a site of 4.8 acres.

When was it filed?

The application was filed on 27 Dec 2024.

Project details

Official titleInstallation of 2nd Catalytic Iso Dewaxing unit of capacity 270 TMTPA (Thousand Metric Ton Per Annum), by M/S Haldia Refinery of Indian Oil Corporation Limited, Located at East Medinipur, West Bengal-Environmental Clearance Regarding
StatusReturned to applicant
Status since30 Apr 2026
Application filed27 Dec 2024
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantIndian Oil Corporation Limited (IOCL)
Land area4.8 acres (2 ha)
Project cost₹967 crore
Village / localityGadadhar Chak
Taluk / tehsilHaldia
DistrictPurba Medinipur
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00905

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 27 Dec 2024 (this page)Returned to applicant4.8 acres₹967 crore
Amendment filed 26 Nov 2024Returned to applicant4.8 acres₹967 crore

In context

27 applications in Purba Medinipur since January 2022 are in the same category (Industry): 12 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.8 acres, this one is smaller than 89% of them.

31 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gadadhar Chak, Haldia, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Purba Medinipur

7 Indian Oil Corporation (IOCL) projects in Purba Medinipur
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.