Quick answers
What is this project?
Proposed H2so4 Pipeline From Iocl Haldia Refinery To Finger Jetty Of Haldia Dock Complex, Syama Prasad Mookerjee Port, Kolkata West Bengal For Crz Clearance is an approved port and coastal project in Paramananda Chak, Haldia, Purba Medinipur, West Bengal.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 21 Jul 2023), as of 27 Nov 2026.
Where is it?
In Paramananda Chak, Haldia, Purba Medinipur, West Bengal.
How big is it?
It has a stated cost of ₹49.9 crore.
When was it filed?
The application was filed on 17 Apr 2023.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 21 Jul 2023 |
| Application filed | 17 Apr 2023 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Project cost | ₹49.9 crore |
| Village / locality | Paramananda Chak |
| Taluk / tehsil | Haldia |
| District | Purba Medinipur |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02524 |
In context
7 applications in Purba Medinipur since January 2022 are in the same category (Ports & coast): 4 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
32 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Paramananda Chak, Haldia, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 42KTA of Propylene Recovery Unit (PRU) at Haldia Refinery by IOCL — lapsed, 650 m away
- 2nd Catalytic Iso Dewaxing unit of capacity 270 TMTPA (Thousand Metric Ton Per… — returned to applicant, 850 m away
- 2nd Catalytic Iso Dewaxing unit of capacity 270 TMTPA (Thousand Metric Ton Per… — returned to applicant, 850 m away
- Proposed Project for Laying of 2.5 Km 14" Lobs Dispatch Header From Haldia… — under coastal review, 950 m away
- 30 KTA De-aromatized Specialty Products (DAS) Unit at Haldia Refinery by IOCL — more information requested, 1000 m away
- EC amendment for Installation of 270 TMTPA capacity 2nd Catalytic Iso Dewaxing… — returned to applicant, 1.1 km away
- Proposed Project for Laying of New Pipelines From New Oil Jetty, Outer… — coastal clearance granted, 1.5 km away
- A) Laying of Phenol Pipeline from HPL plant facility to Finger Jetty. B)… — coastal clearance granted, 2.1 km away
7 Indian Oil Corporation (IOCL) projects in Purba Medinipur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.